VANCOUVER POLICE DEPARTMENT
                      PLANNING, RESEARCH & AUDIT SECTION





   July 14, 1995

   To:       Vancouver City Council

   From:     Ken Higgins
             Acting Chief Constable

   Subject:  Attached Police Department Policy Reports

   The Policy Reports from the Police Department have linkages that may not
   be  obvious  in  the  reading.   The  following  summary  explains these
   linkages and summarizes the financial and personnel impacts.

   P2                INSTALLATION OF  A JAIL  BOOKING AND CRIMINAL  RECORDS
   (attached)    MANAGEMENT SYSTEM (THE CREMM/DES PROJECT)

   This  project involves the  installation of  a computerized  booking and
   criminal records tracking system at  the Police Department.  The  system
   contains elements of a jail booking system  and on-line criminal records
   updating system which is tied into CPIC  and the National Identification
   System.   The Department  is to  provide the  computer hardware  for the
   system at  a cost of $106,100 and the  RCMP will provide the software at
   no cost to the City.

   Installation  of  this  system  will greatly  improve  criminal  records
   management  in the  Department  and will  allow sufficient  productivity
   improvements  to free up four positions in the Information Section.  The
   Department proposes  to  eliminate one  of these  positions  to pay  for
   system installation  and reallocate the  other positions to  other needs
   within  the  Department.   This  reallocation  is  summarized below  and
   discussed in more detail in Report 2 below.

              ELIMINATE                  PROPOSED USE

   1 FTE Warrant Squad clerical     1 FTE Privacy Analyst(sworn)   
         position
   2 FTE CPIC Operators             1 FTE Clerical in FOI Office
                                    1 FTE eliminated to pay for            
                             CREMM/DES
   1 FTE Clerical position          to assist with Information             
                             Management project


   Of the two CPIC Operator positions noted  above, one is currently vacant
   so that elimination will not affect a permanent employee.

   It is proposed that the one time costs of this project be financed  from
   the Service Improvement  Reserve with  repayment (with  interest) to  be
   achieved  over a  four  year period  by the  elimination  of a  clerical
   position.   As a result, there will be no increase cost to the Operating
   Budget.



   P2(i) STAFFING NEEDS IMPOSED BY THE FREEDOM OF INFORMATION &
         PROTECTION OF PRIVACY ACT

   Although this report also  deals with Freedom of Information  issues, it
   is  unrelated to the proposals  reviewed above.   The report reviews the
   needs of the  Department in relation to  the Freedom of  Information and
   Protection of Privacy Act.  The  report notes that, based on comparisons
   with other Police Departments  and other public sector agencies,  a unit
   comprised  of three staff is required  to process the volume of requests
   being received under  the new legislation.  This  compares to the single
   sworn staff member who handles FOI requests at present.

   The proposal of the report is  to convert the existing Sergeant position
   in the FOI section to a civilian coordinator  position and to reallocate
   staff  freed  up because  of the  installation  of the  CREMM/DES system
   (Report 1 above) to staff the  unit.  This can be done with  no increase
   in City cost as follows:

        ELIMINATE
             1  FTE  FOI Coordinator (sworn)         $(81,000)
             1  FTE  Warrant Squad clerical position  (53,000)
        CREATE
             1  FTE  FOI Coordinator (civilian)      $ 70,000
             1  FTE  Privacy Analyst (sworn)           64,000
                                 NET  COST                0

   In addition,  it  is  proposed to  move  a clerical  position  from  the
   Information Section to support  the Freedom of Information Office  at no
   net cost.

   P2(ii)    STAFFING REQUIREMENTS - INFORMATION MANAGEMENT PROJECT

   This is a separate proposal from those above requesting one time funding
   to complete the  Information Management Project  approved by Council  in
   June, 1993.  At that time an Information Manager was approved on  a term
   basis  to develop and  implement an information  management strategy and
   system  for  the  Department.     The  project  has  proceeded   to  the
   implementation   stage   and   additional    temporary   help   is   now
   requested.Implementation of that system  was recognized as an additional
   cost which is  dealt with in  this report.   The work program, which  is
   detailed in the report, requires the following staff support:

   Temporary reclassification of a clerical position          $  3,200
   24 months of temporary clerical support
   (details in the report)                                      72,000
   16 month of temporary clerical support                       
   (details in the report)                                      48,000
     TOTAL                                                    123,200

   1995 cost (approximately)                                    40,000

   The Department has identified  no offsets to this request.   Funding for
   the 1995 portion of the cost  is to be provided from Contingency Reserve
   and the balance will have to be added to the 1996 Operating Budget.

   The Recommendations

   The  recommendations in Reports  P2 and  P2(i) are,  for the  most part,
   inextricably  linked.  Approval of the  recommendations in these reports
   will provide the authority to install the CREMM/DES Project, and convert
   positions freed up to the Freedom of Information Section.

   As  noted, the recommendations in Report P2(ii) are separate and Council
   may deal with them without impacting on the proposals in P2 and P2(i).

   Ken Higgins
   Acting Chief Constable