SUPPORTS ITEM NO. 1
                                           CS&B COMMITTEE AGENDA
                                           MAY 15, 1997         


                             ADMINISTRATIVE REPORT

                                           Date: April 17, 1997
                                           Dept. File No. 2001
                                           C.C. File No. 1006-1


   To:       Standing Committee on City Services and Budgets

   From:     General Manager of Engineering Services

   Subject:  Better  City Government:  Street  Survey  and  Design  Process
             Review


   RECOMMENDATION

        A.   THAT Council  approve funding of $250,000 through  a loan from
             the  Service  Improvement  Reserve to  purchase  equipment and
             training to transfer the Street Survey and Design Process from
             a manual process to a digital process and effect other process
             efficiencies as noted in this report.

        B.   THAT Council approve  a $9500 increase  in the Annual  Streets
             Operating Budget for  software maintenance and cellular  phone
             operating costs.

        C.   THAT  Council approve  the elimination  of position #  2484 in
             1997  and a second position to be identified in 1998, together
             with  an  annual  reduction  in  the  Engineering  Departments
             overtime budget of $12,000 effective 1998 as a source of funds
             to pay back the loan.


   THE GENERAL MANAGER OF ENGINEERING SERVICE COMMENTS

        The General Manager of  Engineering Services RECOMMENDS approval of
        A and B  noting that  the Corporate Management  Team reviewed  this
        proposal and supported the initiative.


   COUNCIL POLICY

        Council approved the Service Improvement Reserve at  its meeting of
        May 18,  1995.   Council approval  is required for   projects  over
        $100,000.

   PURPOSE

   The purpose  of this report is to seek Council s approval for funding of
   $250,000  from the Service Improvement  Reserve and a  $9500 increase in
   the  Annual Streets  Operating Budget.  This expenditure  will fund  the
   transfer of the Street  Survey and Design Process from a  manual process
   to a digital process.


   BACKGROUND

   On June  27, 1996, Council received a letter form the General Manager of
   Engineering  Services  outlining a  work  program  for process  redesign
   initiatives  for 1996.  Two  of those initiatives  are addressed in this
   report.  One initiative  involved the  implementation of  digital survey
   technology (Total  Station) and another involved  application of digital
   drafting and design software.

   On  December 3, 1996 the  Corporate Management Team  approved funding of
   $15,000  from  the Strategic  Initiative Fund  to  hire a  consultant to
   perform  business process review of the street survey and design process
   in  Engineering.  The consultant s recommendations formed the basis of a
   business case to seek funding to implement the recommendations.  

   On April 1,  1997 the  Corporate Management Team  approved the  business
   case  to seek  Council  approval to  borrow  $250,000 from  the  Service
   Improvement Reserve to purchase equipment and training as recommended by
   the consultant.


   DISCUSSION

   The survey and  design process  in the Streets  Design and  Construction
   Branch of Engineering Services remains one of the few which have not yet
   benefitted  from advancements  in  technology over  the  last couple  of
   decades.

   The current process is entirely manual and utilizes technology developed
   in the 1960's.   It  involves data  collection and  layout using  manual
   survey instruments, recording the data with pencil and paper, performing
   calculations  with  a  hand-held   calculator,  plotting  the  data  and
   designing the  street by hand on a paper document.  Engineering Services
   maintains  a collection of about eight thousand of these paper documents
   as permanent records of the surface features on City rights-of-way.

   Over the past  18 months, staff  have developed a new  process utilizing
   electronic survey  technology and computer  software to replace  most of
   the manual functions  of the existing process.   Field data  is captured
   and stored electronically and fed directly to design software along with
   property  line  and other  surface  data  imported from  the  Geographic
   Information System (GIS).   The design software allows the  designers to
   electronically  design  the  street  and  feed  the  layout  information
   directly to the survey instrument for construction layout.  This process
   not  only eliminates the manual  steps and calculations  of the existing
   process, it improves the accuracy of  the information and produces it in
   a  format which can  be stored electronically in  the GIS, thus becoming
   accessible "on-line" for other  Branches in Engineering, as well  as for
   other Departments such as Parks and Planning.

   In  January 1997,  a  consultant was  hired to  analyse  and review  the
   existing survey and design process, as well as the latest innovations in
   survey and  design technology  including the  new  process developed  by
   staff.   The consultant s  recommendations confirmed staff s  choices of
   technology and software which are recognized as industry standards.  

   The latest innovations in  survey technology involves use of  the Global
   Position System  (GPS).   While  this technology  may be  viable in  the
   future, currently  it is much more expensive  and onerous to achieve the
   accuracy  necessary for construction  of street works  than the proposed
   Total Station technology.

   In  addition   to  technology   recommendations,  the   consultant  also
   identified  two  simple  ways   to  improve  efficiency  through  better
   communication. Firstly, providing the surveyors with cellular telephones
   will facilitate communication with the construction crews as well as the
   design  office. Secondly, because the  drafting and design functions are
   codependent and multiple hand-offs of work  occur between the two areas,
   operational efficiency  will be  improved by physically  moving drafting
   and design closer together.


   ENVIRONMENTAL IMPLICATIONS

   There will be no appreciable environmental impact.


   PERSONNEL IMPLICATIONS

   Implementation of  digital technology will result in efficiencies in the
   overall survey and design  process and a corresponding reduction  in the
   staff  required.  Overtime will be reduced, and two full time equivalent
   positions will be eliminated.  One  position will be  eliminated in 1997
   and a  second in 1998. The position to be eliminated this year (1997) is
   currently vacant. The second  position will be identified in  1998 after
   the new process has been put into place.



   A  copy  of  this  report  has  been  sent  to  C.U.P.E.  Local  15  for
   information.

   FINANCIAL IMPLICATIONS

   The  initial cost  to  procure the  recommended  hardware, software  and
   training is $250,000.  The business case to obtain this funding involves
   a loan  from the Service  Improvement Reserve with  a payback  period of
   just  over  four  years.    Repayment  of  this  loan  will  be  through
   operational savings  consisting the  elimination of two  staff positions
   and reduced overtime. 

   Future capital costs  will involve replacement of the  computer hardware
   ($50,000) every  five years  and replacement  of the survey  instruments
   ($100,000)  every eight to ten years.  Annual costs associated with this
   equipment  and   software  consist   of  $3500  annually   for  software
   maintenance and $6000 annually for cellular phones for the surveyors.

   A  cash flow  diagram included  as Appendix  A, shows  the acquisitions,
   annual costs, operational savings, interest, and  the balance owing over
   the next  ten years.  Note that  halfway through year  four the  balance
   owing goes negative which  is the break-even point. After this time, the
   balance owing line represents the net savings of the project.


   IMPLEMENTATION PLAN

   Implementation consists  of procuring the survey instruments, computers,
   and software by the end of May with hands-on training  though June. Once
   the  training  is  complete,  the  development  of  work procedures  and
   standards will begin and should be substantially complete for the street
   design process  by the end of  the year.  Development  and refinement of
   these procedures and  standards department wide will  continue into 1998
   and will liaise with development of mapping standards for the GIS.
    

   CONCLUSIONS

   Staff experience  coupled with the consultant s  recommendations support
   the use of  digital technology in the  street survey and design  process
   within  Engineering.   Based  on the  consultant s recommendations,  the
   initial capital cost  for equipment, software, and  training is $250,000
   with  annual  costs of  $9500.   The  efficiencies introduced  with this
   technology will result  in sufficient savings  in staff resources  which
   justify the expenditure.


                       *    *    *    *    *