POLICY REPORT
                           DEVELOPMENT AND BUILDING

                                           Date: April 21, 1997
                                           Dept. File No.  RWW
                                           CC File: 5303-1


   TO:       Vancouver City Council

   FROM:     Director of Land Use and Development

   SUBJECT:  Proposed Rezoning of 599 Carrall Street
             [Remainder of Block 17; Phases 2a and 2b]

   RECOMMENDATION

        THAT the  following applications  by Robin  Hall, of Davidson  Yuen
        Simpson Architects, be referred to Public Hearing:

        a)     on  behalf  of  the   United  Chinese  Community  Enrichment
               Services Society  (S.U.C.C.E.S.S.), to  rezone the  easterly
               portion of 599  Carrall Street [Phase 2a] (Lot  2, Block 17,
               DL 541, Plan 10212) from BCPED (B.C. Place/Expo District) to
               CD-1 (Comprehensive Development District) for the purpose of
               developing a multi-level care facility; and

        b)     on behalf of  the Real Estate Services Division of the  City
               of Vancouver, to rezone the westerly  portion of 599 Carrall
               Street [Phase 2b] (Lot 2, Block 17, DL 541, Plan 10212) from
               BCPED (B.C.  Place/Expo  District)  to  CD-1  (Comprehensive
               Development District) for  the purpose of  developing market
               housing and limited commercial space, together with:

        (i)    plans received September 16, 1996 [Phase 2a];

        (ii)   draft By-law  provisions [Phases  2a and  2b], generally  as
               contained in Appendix A; and

        (iii)  the  recommendation  of   the  Director  of  Land   Use  and
               Development   to  approve   the  applications,   subject  to
               conditions  of approval contained  in Appendix B  [Phase 2a]
               and Appendix C [Phase 2b].

        FURTHER  THAT  the  Director  of  Land  Use  and  Development  make
        application to amend  the Sign By-law to  establish regulations for
        the Phase 2b CD-1 in accordance with Schedule B (HA-1).

        AND FURTHER  THAT the Director  of Legal Services be  instructed to
        prepare  the  necessary  by-laws for  consideration  at  the Public
        Hearing.

   GENERAL MANAGER'S COMMENTS

        The  General Manager of  Community Services RECOMMENDS  approval of
        the foregoing.

   COUNCIL POLICY

   The following Council-adopted Policies and Guidelines are relevant: 

   -  Central Area Plan, adopted December 3, 1991;
   -  Public Art Policies and Guidelines, adopted June 23, 1994; and
   -  Community  Amenity  Contribution  Policy,  adopted  July  10,   1990,
      reconfirmed March 7, 1991.

   PURPOSE AND SUMMARY

   This  report  assesses  two  rezoning  applications by  Robin  Hall,  of
   Davidson Yuen Simpson Architects:

   a) Phase 2a   on  behalf  of   S.U.C.C.E.S.S.,  to  develop  a   100-bed
                 multi-level care facility;

   b) Phase 2b   on behalf  of the  Real  Estate Services  Division of  the
                 City   of   Vancouver,   to  allow   for   development  of
                 approximately  200  dwelling  units,  with  provision  for
                 commercial uses along Keefer and Taylor Streets.

   Analysis of the  applications indicates there are no  significant issues
   related  to the  multi-level  care  facility (Phase  2a).   The  Special
   Advisory Committee  to Council on  Seniors has expressed  concerns about
   the  proposed tower in Phase 2b, because  of shadow implications.  These
   concerns are addressed in the report.

   Staff support  approval of the  two rezoning applications  and recommend
   that both be referred to Public Hearing.

   DISCUSSION

   Background:  Discussions and negotiations related to City-owned Block 17
   have been ongoing for a number of years.  In  March 1994, VLC Properties
   submitted a rezoning application for all of Block 17.  In November 1994,
   the Chinese Benevolent Association (CBA) was given a conditional project
   allocation under  the 1994/1995  Non-profit Housing  component of  HOMES
   B.C.  To facilitate  the rezoning process and enable staff  to deal with
   the non-market  housing and social  service centre component  first, VLC
   split  the  Block  17  rezoning  proposal  into  two  separate  rezoning
   applications.  See the following site plan.

   The  Phase  1 rezoning  was completed  in April  of 1996  with Council s
   enactment of the CD-1  zoning.  By early 1996 VLC  withdrew its interest
   in the remainder  of the site, and the Real Estate Services Division has
   chosen  to  proceed  with  rezoning of  the  remainder  of  Block 17  in
   conjunction with S.U.C.C.E.S.S.

                                      MAP





























   Design  Development: The  two rezoning  applications  are being  handled
   through  slightly  different  approaches.   The  S.U.C.C.E.S.S. proposal
   (Phase  2a) involves  a  CD-1 rezoning  along with  a  specific form  of
   development.   The market housing  component (Phase 2b) involves  a CD-1
   rezoning augmented  with guidelines,  as it is  intended that  this site
   will  be  marketed and  sold  or  leased  to an  as-of-yet  unidentified
   developer.  The  CD-1 by-law and the  guidelines have been  developed on
   the basis  of conceptual massing which  has been reviewed by  staff, the
   Urban   Design  Panel  and  the  Chinatown  Heritage  Advisory  Planning
   Committee, and received support.  A summary of how the massing  has been
   derived is described in Appendix D (section on Urban Design).

   The  Special Advisory  Committee  to Council  on  Seniors has  expressed
   concerns about the  shadow effects  of the  proposed market  residential
   tower on Phase  1 (see Appendix E).   Several alternative configurations
   were studied, and the proposed  tower location maximizes solar access to
   both Phase 1  and Phase 2.  In response to the Committee s concerns, the
   applicant comments as follows:

       Canton Alley is a very  narrow space and, as a result,  the adjacent
      building tend  to be shaded much  of the time.   While the tower does
      cast some shadow  into Canton Alley between approximately  11:00 a.m.
      and 1:00  p.m. at the equinox,  a building of  one half, or  even one
      third, the  proposed height  would have  a similar  effect.   Shadows
      cast in Canton Alley prior to 11:00 a.m. and after 1:00 p.m.,  result
      from  the  S.U.C.C.E.S.S.    Social  Services  and  the  CBA  Housing
      buildings themselves.   The S.U.C.C.E.S.S. roof terrace is  shaded by
      the tower from approximately  1:00 p.m. to 3:00 p.m.  at the equinox.
      A shorter building, or a tower  in another location, would have  much
      the same effect. 

   Other  comments from  the Committee  are addressed  by the  applicant in
   Appendix E (see  Applicant s Comments ).

   Considering all the objectives  which are being achieved on the Block 17
   site,  Planning staff  believe that  the current  proposal represents  a
   reasonable  design response.   Some compromises are  involved, and these
   are considered to be acceptable.

   Neighbouring  Property Owner s Concerns:  A neighbouring property owner,
   Mr.  Jack Chow,  has raised  issues pertaining  to building  setbacks on
   Pender  Street  and  along  Shanghai  Alley (not  part  of  the  current
   applications)  and recommended that  the City provide  additional public
   parking on Block  17.  These viewpoints have  been previously considered
   by Council  as part of  the Phase 1  rezoning, however, Council  took no
   action  on them.   See  Appendix E, Public  Input, for  a  more detailed
   description and staff response.

   CONCLUSION

   Staff  conclude that  both  applications should  be  referred to  Public
   Hearing for approval.
    

                                   * * * * *


    General Mgr./Dept. Head:     Report dated:  April 21, 1997    

                                 Author: Rob Whitlock             

    Date:                        Phone: 7814 IRTS Number: CC97021  



    This report has been
                                 Concurring Departments    prepared in consultation
    with the departments listed
    to the right, and they
    concur with its contents.








   RWW\ws\mp
   R:\CC\REPORTS\COUNCIL\MAY6\P2.





                    OUTLINE OF DRAFT CD-1 BY-LAW PROVISIONS

                     599 CARRALL STREET [PHASES 2a AND 2b]


   Phase 2a    (S.U.C.C.E.S.S. Multi-level Care Proposal)


   Uses:       Special Needs Residential Facility - Class B
               Accessory Uses customarily ancillary to the above uses.

   FSR:        1.8

   Height:     3 Storeys and 14 m

   Parking:    Off-street   parking  must   be   provided,  developed   and
               maintained in  accordance with the  applicable provisions of
               the   Parking   By-law,  except   that  the   Special  Needs
               Residential Facility will provide parking at the rate of one
               space for every six beds and one space for every 10 beds for
               visitor parking.

   Loading:    Loading spaces  are to  be provided in  accordance with  the
               Parking By-law.

   Acoustics:  In accordance with RM-4N District Schedule


   Phase 2b    (Real Estate  Services Division  [on behalf  of the  City of
               Vancouver] Market Housing Proposal)


   Uses:       Dwelling Units
               Accessory Uses customarily ancillary to the above uses.

               The following uses limited to  the first floor of Keefer and
               Taylor Street frontages:

      -        Cultural  and  Recreational Uses,  limited to  Club, Fitness
               Centre, Hall, Library, Museum or Archives and Theatre;
      -        Institutional  Uses,  limited  to  Child  Daycare  Facility,
               Public Authority Use and Social Service Centre;
      -        Office Uses, limited to General  Office, Health Care Office,
               and Health Enhancement Office;
      -        Retail  Uses, limited  to Grocery or  Drug Store  and Retail
               Store; and
      -        Services  Uses,  limited to  Animal  Clinic, Barber  Shop or
               Beauty  Salon,  Laundromat  or  Dry Cleaning  Establishment,
               Print  Shop, Repair  Shop  Class B,  Restaurant  - Class  1,
               School - Arts  or Self- Improvement, School -  Business, and
               School - Vocational or Trade.

   FSR:        4.1

   Height:     70 m

   Parking:    Off-street  parking  must  be  provided  and  maintained  in
               accordance  with the  applicable provisions  of the  Parking
               By-law, except that residential parking  will be provided at
               the  rate of  0.4 spaces  for every  dwelling unit  plus one
               space for every 100 square metres GFA (International Village
               Standards).

   Loading:    One loading bay is to be provided.

   Acoustics:  In accordance with RM-4N District Schedule
                            CONDITIONS OF APPROVAL

                     [Phase 2a - S.U.C.C.E.S.S. Proposal]


   (a)  THAT the  proposed form  of development be  approved by  Council in
        principle,  generally   as  prepared   by  Davidson   Yuen  Simpson
        Architects,  and   stamped  "Received  City   Planning  Department,
        September 16, 1996",  provided that  the Director  of Planning  may
        allow minor alterations to this form of development  when approving
        the detailed scheme of development as outlined in (b) below.

   (b)  THAT, prior to approval by Council  of the form of development, the
        applicant shall obtain approval of a development application by the
        Director  of  Planning, who  shall  have particular  regard  to the
        following:

        (i)   any subsequent development  application will be submitted  to
              the  Ministry of  Small Business and  Tourism, for Provincial
              Heritage clearance;

        (ii)  all structures,  including decorative finishings,  are not to
              encroach onto  the existing right-of-way connecting  Shanghai
              Alley with Taylor Street;

        (iii) delete references to Shanghai Mews on the plans;

        (iv)  provision   of   bicycle    parking   in    accordance   with
              Council-approved  guidelines  or by-laws  applicable  at  the
              development application;

        (v)   redesign the drop-off/turn-around  loop at Shanghai Alley  to
              reduce vehicular conflicts between  vehicles in the lane  and
              vehicles using the loop.  The  main flow of traffic should be              kept  along  Shanghai Alley,  with  the  loop  used only  for
              drop-off and  turn-around. This will require  redesigning the
              traffic  island,   and   providing   a  paving   pattern   to
              distinguish the lane from the loop;

        (vi)  provision of a  minimum width of 6.0 metres for  traffic lane
              within the loop to allow for by-passing a stopped vehicle;

        (vii) the existing right-of-way  connecting to Shanghai Alley is to
              be modified  to include all sidewalks and drive aisles within
              the  drop-off/turn-around loop,  to the  satisfaction of  the
              City Engineer and the Director of Legal Services;






        (viii)  the transition  to the maneuvering  aisle on  the right side
                of  the 12.5%  entry ramp  is not  acceptable.  A transition
                ramp is to be provided;

        (ix)    provide for on-site garbage compaction, to the  satisfaction
                of the City Engineer;

        (x)     special   surface   treatment   of  Shanghai   Alley   which
                represents potentially high  maintenance costs and liability
                concerns to  the City  may be  the subject  of a  registered
                Encroachment  Agreement for  this  portion  of  the lane  to
                obligate maintenance  by the adjacent  properties.   If this
                is not  done, Council  should be  made aware  of the  higher
                maintenance  costs undertaken  by  the  City.   Any  special
                treatment must be approved by the City Engineer;

        (xi)    design  development to reduce opportunities  for mischief in
                the exit stairwell located on Carrall Street;

        (xii)   design  development to  reduce  opportunities for  break and
                enter; and

        (xiii)  design  development  to improve  security and  visibility in
                underground parking area in accordance  with section 4.12 of
                the  Parking By-law  and provision  to paint  the walls  and
                ceiling of the parking garage white.

   (c)  The  following requirements  shall  be  the  subject  of  agreement
        between the City and any future owner or lessee of the site:

        (i)     all  BC Hydro  and BC  Tel services  are to  be  underground
                within  the site from  the closest  suitable pole or service
                point at the applicant s expense; and

        (ii)    a  site servicing agreement  to the satisfaction of the City
                Engineer  will be  required to  ensure that  all Engineering
                requirements are met, including:

                (1)  a  private  roadway  system  connecting  Shanghai Alley
                     with  Taylor  Street  must  be  constructed.    If this
                     roadway is constructed with the  Phase 1 project, Phase
                     2a  and Phase  2b are  to contribute  the proportionate
                     share  of the  common costs.    The following  must  be
                     provided:

                     - the  two-way  portion   of  Shanghai  Alley  running
                       east/west  shall  have 2.9  metre-wide  sidewalks on
                       both sides,  with a  pavement width  of 7.0  metres.
                       The  one-way northbound  portion  of Shanghai  Alley
                       shall  have a 2.44  metre-wide sidewalk on  the west
                       side, a 1.83  metre-wide sidewalk on the  east side,
                       and a pavement width of 5.94 metres;

                     - sidewalks with curb and  gutters must be constructed
                       in Shanghai Alley; and

                     - street lighting must be provided in Shanghai Alley.

                   (2)  landscaping,  boulevard  trees,  tree  grates,   street
                     lighting   and  special   street,  lane   and  sidewalk
                     treatments  on City  property must  be provided  to the
                     satisfaction  of the  City  Engineer, and  to Chinatown
                     Beautification Standards at the perimeter of the site.

   (d)  THAT, prior to  enactment of the CD-1 By-law,  subdivision of Lot 2
        to create the site shall occur to the satisfaction of the Approving
        Officer.

   (e)  The following commitment will be undertaken by the City:

        (i)  The City shall bear the cost of soil remediation.  The Manager
             of Real Estate Services shall supervise this work.


                            CONDITIONS OF APPROVAL

              [Phase 2b - Real Estate Services Division Proposal]


   (a)  THAT, if approved at Public Hearing, the CD-1 By-law be accompanied
        by CD-1 guidelines entitled  599  Carrall Street (Phase 2b -- Block
        17) CD-1  Guidelines  to be  adopted by resolution of  Council (see
        Appendix G for draft which staff will continue to develop up to the
        Public Hearing).

   (b)  THAT, prior to approval by Council of the form  of development, the
        applicant shall obtain approval of a development application by the
        Director of Planning, who shall have particular regard to the above
        guidelines, and the following:

        (i)     any subsequent development application will be submitted  to
                the Ministry of Small Business  and Tourism, for  Provincial
                Heritage clearance;

        (ii)    all structures,  including decorative finishings, are not to
                encroach onto the  existing right-of-way connecting Shanghai
                Alley with Taylor Street;

        (iii)   delete references to Shanghai Mews on the plans;

        (iv)    provision    of   bicycle   parking   in   accordance   with
                Council-approved guidelines  or  by-laws  applicable at  the
                development application;

                (NOTE: If  this sidewalk extends  into private  property not
                encompassed   by  the   existing  right-of-way,   then   the
                right-of-way is to be modified to include this sidewalk.)

        (v)     the  porte-cochäre  must  be  deleted.    If  a  drop-off is
                desired, an  indented lay-by could  be designed  as part  of
                the  lane,  but  a 2.9  metre-wide  sidewalk  path  must  be
                maintained;

                (NOTE: If  this sidewalk extends  into private  property not
                encompassed   by  the   existing  right-of-way,   then   the
                right-of-way is to be modified to include this sidewalk.)

        (vi)    redesign the drop-off/turn-around  loop at Shanghai Alley to
                reduce vehicular conflicts between vehicles  in the lane and
                vehicles using  the loop.  The  main flow of traffic  should
                be kept  along Shanghai Alley, with  the loop used only  for
                drop-off and turn-around. This will  require redesigning the
                traffic  island,   and   providing  a   paving  pattern   to
                distinguish the lane from the loop;

        (vii)   provision of a minimum  width of 6.0 metres for the  traffic
                lane of the loop to allow for by-passing a stopped vehicle;

        (viii)  the existing right-of-way  connecting to  Shanghai Alley  is
                to be  modified to  include all  sidewalks and drive  aisles
                within  the drop-off/turn-around  loop, to  the satisfaction
                of the City Engineer and the Director of Legal Services;

        (ix)    redesign  the  ramp system  to  remove  the off-set  at  the
                bottom of  the parking  entry ramp.   This  will require  an
                alignment  change, a  clockwise  ramp  and  a parking  level
                entry system;

        (x)     provide for on-site  garbage compaction, to the satisfaction
                of the City Engineer;

        (xi)    concerns of the Fire Department outlined in Appendix E  need
                to be addressed;

        (xii)   CPTED  principles  identified  in  Appendix   E  are  to  be
                addressed; and

        (xiii)  special   surface   treatment  of   Shanghai   Alley   which
                represents  potentially high maintenance costs and liability
                concerns to  the City  may be  the subject  of a  registered
                Encroachment  Agreement for  this  portion  of  the lane  to
                obligate maintenance  by the adjacent  properties.   If this
                is not  done, Council  should be  made aware  of the  higher
                maintenance  costs undertaken  by  the  City.   Any  special
                treatment must be approved by the City Engineer.

   (c)  The  following requirements  shall  be  the  subject  of  agreement
        between the City and any future owner or lessee of the site:

        (i)     all  BC Hydro  and BC  Tel services  are to  be  underground
                within  the site  from the closest suitable  pole or service
                point at the applicant s expense;

        (ii)    a public art agreement on the usual terms and conditions;

        (iii)   an  agreement  to not  discriminate  against  families  with
                children; and

        (iv)    a  site servicing  agreement  to  the  satisfaction of  City
                Engineer will be required  for this site to ensure that  all
                Engineering requirements are met, including:

                (1)  a  private  roadway  system connecting  Shanghai  alley
                     with  Taylor  Street  must  be  constructed.    If this
                     roadway is constructed with the  Phase 1 project, Phase
                     2a  and Phase  2b are  to contribute  the proportionate
                     share of  the  common costs.    the  following must  be
                     provided:

                     - the  two-way  portion  of  Shanghai  Alley   running
                       east/west  shall have  2.9  metre-wide sidewalks  on
                       both sides,  with a  pavement width  of 7.0  metres.
                       The  one-way northbound  portion  of Shanghai  Alley
                       shall  have a 2.44  metre-wide sidewalk on  the west
                       side, a 1.83  metre-wide sidewalk on the  east side,
                       and a pavement width of 5.94 meres;

                     - sidewalks with curb and gutters must be  constructed
                       in Shanghai Alley;

                     - street lighting must be provided in Shanghai Alley;

                (2)  Taylor  Street widening  work  and  the  final lift  of
                     asphalt on  Taylor Street  is  to be  completed to  the
                     satisfaction   of  the   City  Engineer,   and  at  the
                     applicant s cost;

                (3)  if more than  200 units are  proposed by the developer,
                     upgrading of the sanitary sewer is required; and

                (4)  landscaping,  boulevard  trees,  tree  grates,   street
                     lighting  and   special  street,   lane  and   sidewalk
                     treatments  on City  property must  be provided  to the
                     satisfaction of  the City  Engineer,  and to  Chinatown
                     Beautification  Standards at the perimeter of the site;


   (d)  THAT, prior to  enactment of the CD-1 By-law,  subdivision of Lot 2
        to create the subject site  shall occur to the satisfaction  of the
        Approving Officer.

   (e)  The following commitments will be undertaken by the City:

        (i)     The City shall bear the cost  of remediating the soils.  The
                Manager of Real Estate Services  shall supervise this  work;
                and

        (ii)    the  Community Amenity  Contribution of  $1,054,070.00 shall
                be paid  from the Property  Endowment Fund at  the time  the
                market parcel is leased or sold.


                           NON-CONTENTIOUS ELEMENTS


   SITE, SURROUNDING  ZONING  AND  DEVELOPMENT:    The  site  sits  between
   Chinatown to the  north and east, International Village to  the west and
   south-west,  and  Andy Livingstone  Park  to  the  south.   The  Chinese
   Cultural  Centre  and  Dr.  Sun Yat-Sen  Classical  Gardens  are located
   immediately east across Carrall Street.  A  context plan is shown on the
   next page.

   Block 17 is  bounded by Pender, Carrall, Keefer and  Taylor Streets, and
   consists of three components.  The north-east corner is owned privately,
   and occupied by  a number of  older buildings, including  the Jack  Chow
   Real Estate & Insurance Ltd. offices housed in the  thinnest building in
   the world  (8 West Pender Street).  The remainder  of the block is owned
   by  the City of Vancouver.  The north-west corner of the block (known as
   Phase 1) is  already zoned CD-1 (#348)  by By-law No. 7556  passed April
   23, 1996  which allows non-market  housing, a social service  centre for
   S.U.C.C.E.S.S.  and  a small  amount  of  commercial use.    Development
   application No.  DE400437 was reviewed by Council in April 1996, and the
   development permit was issued August 8, 1996.  Construction is likely to
   start in 1997, subject to Provincial funding.

   PROPOSED DEVELOPMENT:   The subject  rezoning sites are broken  into two
   distinct components:

   Phase 2a (S.U.C.C.E.S.S. Multi-level Care Facility)

   To be developed with a 100-bed multi-level care facility  to be operated
   by S.U.C.C.E.S.S.  The  site will be leased by the  City of Vancouver to
   the B.C. Ministry of Health.

   The form  of development will  be as  represented in plans  submitted by
   Davidson   Yuen  Simpson  Architects,  dated  September  16,  1996,  and
   presented in Appendix F  of this report.  Provisions of  the CD-1 By-law
   include:

   -  use  to   be  Special  Needs   Residential  Facility  -   Class  B   p
             lus accessory uses;

   -  a maximum FSR of 1.8; and

   -  a maximum height of 14 m and three storeys.


   CONTEXT PLAN:


   Phase 2b (Real Estate Services Division, Residential Proposal)

   To be developed with a market residential development with the potential
   for commercial/retail/service at grade on Keefer Street.  
   The  applicant  indicates  that  approximately   200  dwelling-units  is
   possible, but the  actual number of units  will not be specified  in the
   by-law and will depend upon the unit make-up established by the ultimate
   purchaser or lessee.

   The  form  of   development  will  be  controlled   by  Council-approved
   guidelines  (see Appendix G for  draft guidelines) which will supplement
   the provisions of the CD-1 By-law, including:

   -  uses   to  include   dwelling  units,   plus  selected   cultural  and
      recreational,  institutional, office,  retail and  service uses,  with
      these non-residential uses limited to a maximum  of 500 m2 fronting on
      Keefer Street;

   -  a maximum FSR of 4.1; and

   -  a maximum height of 70 m.

   USE AND DENSITY: The proposed  uses of residential, multi-level care and
   limited  commercial on  Keefer are  appropriate  in the  context of  the
   surrounding residential and  commercial districts.  Densities  have been
   derived  from  two  sources, the  first  being the  need  to  achieve an
   economic balance between the provision of a much needed care facility in
   Phase  2a and the  City s need to  fund that project  by recouping funds
   through the sale or  lease of the Phase 2b site.   The second derivation
   of density has been massing  studies undertaken by Davidson Yuen Simpson
   Architects, resulting in the optimum  conceptual design as described  in
   the following section.

   URBAN DESIGN: The overall  form of development for all of  Phase 2 is an
   outcome of previous  studies related to the  site (e.g., during Phase  1
   work), plus analysis of the  surrounding context in preparation of these   rezoning applications.   The full extent of the  applicant s analysis is
   contained   in  the  document  entitled    Block  17  Phase  2  Rezoning
   Application  28 August  1996",  as prepared  by  Davidson Yuen  Simpsons
   Architects,  and   stamped   Received   September  16,   1996,  Planning
   Department (Land Use and Development Division).  A copy of this document
   is on file with the City Clerk s Office for reference.

   In summary, the form of development is premised on the following points:

   -  a  three-to  four-storey  street  wall  is  established  along Taylor,
      Keefer and Carrall Street to relate to adjoining developments in  both
      the International Village and Chinatown;
   -  the site plan provides for a transition between  the tower plus podium
      form established in International  Village and the lower scale of  the
      Chinese  Cultural Centre  and  Dr. Sun  Yat-Sen  Gardens to  the  east
      across Carrall Street, and to the low scale of Chinatown beyond;

   -  the  residential tower  is situated  in the  context of  other  towers
      proposed in International  Village.  The  tower will be  one of  three
      which  will frame  the  west end  of  Andy Livingstone  Park,  at  the
      intersection of Taylor and Keefer Streets; and

   -  the  tower is situated  in a location to produce  the least shadow for
      Phase 2 developments and for Dr. Sun Yat-Sen Gardens  to the east, and
      to minimize the effect of shadows on the Phase 1 development.

   The Urban Design Panel has  commented positively on this massing concept
   (See Appendix E).

   HERITAGE CLEARANCE: As Block 17 is a City-owned, Provincially designated
   heritage site, the City must seek the approval of the Minister  of Small
   Business,  Tourism  and  Culture  for  any  alternations  to  the  site.
   Ministry  staff have  been  provided  with  on-going  information  about
   development  plans for the  site.  City  staff have been  advised that a
   letter is to  be received shortly from the  Minister indicating concerns
   with the alignment and treatment  of Shanghai Alley.  Further discussion
   with Ministry staff  indicates that if the alignment  cannot be changed,
   that  some effort be made to  acknowledge the historic importance of the
   Alley through  means such  displays or treatment  of the  Alley.   Staff
   believe this  is an  issue that  can be  dealt with  at the  development
   application stage,  where discussions can occur with  Ministry staff and
   the applicant when Ministry clearance is sought.

   SIGN  BY-LAW  AMENDMENTS:  If  the  application is  approved  at  Public
   Hearing, an amendment to  the Sign By-law will be  required to establish
   sign  regulations for  this  CD-1  site in  accordance  with Schedule  B
   (HA-1)(Chinatown).   Until recently,  such an  amendment by Council  was
   made at the time it enacted the CD-1 By-law for a site.  On February 25,
   1997,  Council  approved  a  Sign By-law  amendment  which  requires the
   payment   of  fees  for   privately-initiated  Sign  By-law  amendments,
   including a nominal  fee for adding CD-1  sites to Schedule B.   As this
   rezoning  application  was  made  prior  to  February  25,  1997,  staff
   recommend that the required  Sign By-law amendment be  initiated through
   an application by the Director of Land Use and Development.

   PUBLIC AND  SOCIAL BENEFITS:  The overall development  of Block  17 will
   provide  for  a  non-profit  multi-level   care  facility,  as  well  as
   facilities   for  both   S.U.C.C.E.S.S.  and   the  Chinese   Benevolent
   Association (CBA).  The sale of a portion of the site for market housing
   will underwrite the  public benefits which will accrue  to the community
   at large through the remaining development.



   The market proposal in  Phase 2b is required to pay  a Community Amenity
   Contribution (CAC).  The rate  has been previously determined by Council
   at  $6.00 a square foot.   The total value  of the CAC is $1,054,070.00,
   which is included in Appendix C, as condition (e)(ii).

   There  are no  implications  with respect  to  the Vancouver  Children's
   Policy or Statement of Children's Entitlement.

   ENVIRONMENTAL IMPLICATIONS: The  location of major institutions  such as
   S.U.C.C.E.S.S. and  CBA in close  proximity to Chinatown itself,  and to
   the Chinese Cultural Centre and Dr.  Sun Yat-Sen Gardens will reduce the
   need for multiple trips within the area.  Residents on site will be able
   to walk to all of these facilities with ease.




              INPUT FROM THE PUBLIC AND OTHER REVIEWING AGENCIES


   PUBLIC  INPUT: Rezoning  information signs  were posted  on the  site on
   November 1, 1996.  An early notification letter was sent to  surrounding
   registered property  owners on November  14, 1996.  One  property owner,
   Mr. Jack  Chow, of  Jack  Chow Real  Estate &  Insurance Ltd.  ( World s
   Famous Building Corporation   [pertaining to the  narrowest  building in
   the world   at  8 West  Pender Street]),  has met  with  staff and  made
   numerous representations pertaining to two concerns:

   1.    the  inadequacy of  setbacks  of the  S.U.C.C.E.S.S./CBA  building
         along East Pender Street and Shanghai Alley; and

   2.    the need  to provide  much-needed public  parking on  Block 17  in
         addition to the development requirements of the site.

   Mr. Chow s concerns in regard  to setbacks on Phase  1 do not relate  to
   the two current rezoning applications.* 

         *  (NOTE: Adjustments have been  agreed to by S.U.C.C.E.S.S. to adjust  sidewalk
              and pavement widths in Shanghai Alley itself, as follows:

                                    Rezoning Drawings          Change

          Westerly sidewalk        9.5 ft. [ 2.896 m]        8.0 ft. [ 2.44 m]
          Easterly Sidewalk        4.0 ft. [ 1.22 m]         6.0 ft. [ 1.84 m]
          Street width            20.0 ft. [ 6.1 m]         19.5 ft. [ 5.94 m]

          Total                   33.5 ft. [10.21 m]        33.5 ft. [10.21 m]

          These  changes  were  undertaken  voluntarily  by  S.U.C.C.E.S.S.  in  order  to
          accommodate Mr.  Chow s concerns without  damaging their proposal  and have been
          incorporated in the subsequent development permit.   Changes to the  East Pender
          Street setback are  not possible.   Mr. Chow has  made his  views known on  this
          issue at the Public Hearing related to that separate site, now zoned CD-1.)

   With respect to the idea of including additional on-site public parking,
   Engineering  staff have continued to monitor Chinatown s overall parking
   needs.  Since Mr. Chow last raised this idea during the consideration of
   the rezoning of  Phase 1  of Block  17, the Murrin  parkade has  opened,
   providing over  950 parking  spaces.  The  overall parking needs  of the
   Chinatown  area have been  the subject of  much study, and  the City has
   identified a basic need of  approximately 600 parking spaces in addition
   to the existing on and off-street  parking.  This has been reflected  in
   the  current usage  of the  Murrin  parkade.   The parkade  is centrally
   located to  serve the Chinatown community, and is within three blocks of
   G.M. Place.  In addition,  the International Village development (across
   Taylor Street from Block  17 has a large  amount of parking for  its own
   needs and an  additional 350 public parking spaces  for stadium demands.
   With the abundance  of parking available  in the downtown, and  with the
   proximity  of Skytrain  to G.M.  Place and  B.C. Place,  stadium parking
   needs have been adequately provided.  The Block 17 development will have
   adequate parking  for its own  needs, including a provision  for visitor
   parking.   With an  amount of parking  in the area  already provided for
   existing and  future needs,  additional public parking  on the  Block 17
   site is not supported.

   COMMENTS  OF THE  MANAGER  OF  ENGINEERING  SERVICES -  Engineering  has
   identified the following conditions of approval:

   1.    A  private roadway  system connecting  Shanghai Alley  with Taylor
         Street must be  constructed.  If this roadway is  constructed with
         the Phase  1 project,  Phase 2a  and Phase  2b  are to  contribute
         their  proportionate share  of the  common costs.    The following
         must be provided:

         (i)    the  two-way portion  of  Shanghai Alley  running  east/west
                shall have 2.9  metre-wide sidewalks on  both sides,  with a
                pavement  width  of  7.0  metres.    The  one-way northbound
                portion  of Shanghai  Alley  shall  have  a 2.44  metre-wide
                sidewalk  on the  west side,  a 1.83  metre-wide sidewalk on
                the east side, and a pavement width of 5.94 metres;

         (ii)   sidewalks  with curb  and  gutters  must  be constructed  in
                Shanghai Alley; and

         (iii)  Street lighting must be provided in Shanghai Alley.

   2.    All  structures,  including   decorative  finishing,  are  not  to
         encroach onto the existing Right-of-Way connecting Shanghai  Alley
         with Taylor Street.

   3.    Delete references to Shanghai Mews on the plans.

   4.    Clarification is  required for  the number of  units in Phase  2b.
         If there  are more  than 200  units proposed  by the  development,
         upgrading of the sanitary sewer may be required.

   5.    Off-street parking must be  provided, developed and maintained  in
         accordance with the applicable  provisions of the Parking  By-law,
         except as follows:

         (i)    the multi-care facility will provide parking at a rate of  1
                space  per 6  beds for  staff and  1 space  per 10  beds for
                visitors; and

         (ii)   the market  housing will provide  parking at a  rate of  0.4
                spaces per  unit, plus  1 space  per 100  square meters  GFA
                (International Village Standards).

   6.    Provision  of   off-street  passenger   loading  spaces   for  the
         multi-care facility as per the Parking By-law.

   7.    Provision of one off-street loading space for the market housing.

   8.    Provision of bicycle  parking in accordance with  Council-approved
         guidelines or  by-laws  applicable  at  the  time  of  Development
         Application.

   9.    The porte-cochäre  for the market housing is  not supported.  If a
         drop-off is desired, an indented lay-by could  be designed as part
         of  the  lane,  but  a  2.9  metre-wide   sidewalk  path  must  be
         maintained.

   10.   Redesign  the  drop-off/turn-around  loop  at  Shanghai  Alley  to
         reduce vehicular  conflicts  between  vehicles  in  the  lane  and
         vehicles  using the loop.  The main flow of traffic should be kept
         along Shanghai  Alley,  with  the loop  being  accessed  only  for
         drop-off or turn-around purposes.   This will require  redesigning
         the traffic island,  and providing a paving pattern to  define the
         lane from the loop.

   11.   Provision of a minimum  width of 6.0 metres for  the loop to allow
         for a by-pass of a stopped vehicle.

   12.   The  existing Right-of-Way connecting to  Shanghai Alley  is to be
         modified  to include  all sidewalks  and drive  aisles  within the
         drop-off/turn-around  loop,  to   the  satisfaction  of  the  City
         Engineer and the Director of Legal Services.

   13.   Redesign the ramp system for the residential  building in Phase 2b
         to remove the  off-set at  the bottom of  the parking entry  ramp.
         This will  require an  alignment change,  a clockwise  ramp and  a
         parking level entry system.

   14.   The transition to the  maneuvering aisle on the right side  of the
         12.5% entry  ramp  in a  multi-care facility  in Phase  2a is  not
         acceptable.  Provide a transition ramp.

   15.   Provision  of on-site  garbage compactors for  each phase,  to the
         satisfaction of the City Engineer.

   16.   Taylor  Street widening  work and  the final  lift  of asphalt  on
         Taylor Street is to  be completed to the satisfaction  of the City
         Engineer, and at the applicant s cost.

   17.   Landscaping, boulevard  trees, tree  grates,  street lighting  and
         special street,  lane  and sidewalk  treatments  on City  property
         must  be provided to the satisfaction of the City Engineer, and to
         Chinatown Beautification Standards at the perimeter of the site.

   18.   Special  surface  treatment  of  Shanghai  Alley which  represents
         potentially high maintenance costs  and liability concerns to  the
         City  may  be  subject   to  a  registration  of  an  Encroachment
         Agreement for this portion of the lane  to obligate maintenance by
         the adjacent properties.  If this  is not done, Council should  be
         made  aware of  the  higher  maintenance costs  undertaken  by the
         City.    Any  special  treatment must  be  approved  by  the  City
         Engineer.

   19.   All BC Hydro and BC  Tel services are to be underground within the
         site  from the  closest  suitable pole  or  service point  at  the
         applicant s expense.

   20.   A  Site Servicing  Agreement will  be required  for  this site  to
         ensure that all Engineering requirements are met.

   CHINATOWN HISTORIC AREA PLANNING COMMITTEE (CHAPC):  The following is an
   extract from the CHAPC meeting of September 10, 1996:

          Block 17 - Phase 2

         Messrs.  Ron  Yuen  and  Robin  Hall   of  Davidson  Yuen  Simpson
         Architects presented a model and design drawings to  the Committee
         for  a proposed  4-storey multi-level  care facility,  (100 units)
         fronting  Carrall  Street,  and  a  24-storey   residential  tower
         project with possible  retail, contained within City-owned land on
         Block 17, bounded by Carrall, Pender, Keefer and Taylor Streets.

         Mr.  Yuen   underscored  the  fact  the  care  facility  had  been
         specifically designed  to meet needs  of the  Chinatown community,
         where  approximately  1,000   people  are  wait-listed   for  care
         facilities.    He noted  that  the  street-hugging concept,  which
         incorporates design elements of  Chinatown, had been developed  to
         afford privacy and  maximize outdoor spaces, utilizing small walls
         and screening for security.

         The multi-care facility, including  adult daycare (located on  the
         main floor  near S.U.C.C.E.S.S.  Social  Services), extended  care
         and a  24-hour administrative component,  will allow  residents to
         remain  in familiar  surroundings as  their support  needs expand,
         rather  than  having  to   relocate  to  another  care   facility.
         Accommodations, grouped  into pods on  three levels,  will consist
         of  spacious single  units, five double  rooms (10  beds); private
         washrooms, laundry  facilities and dining salons  convertible into
         larger  rooms.    The project,  which  will  utilize the  proposed
         Shanghai  Alley  as  a  drop-off  point,  is  not  anticipated  to
         engender a  lot of traffic (other than  at shift changes) or alter
         traffic patterns around the building.

         It  is anticipated two rezoning  applications will be submitted in
         late September; one  for the aforementioned care facility fronting
         Carrall  Street, and  one for the  residential tower  project with
         shops  and  some retail.    The  applications will  go  to  Public
         Hearing for a Council decision in February or March 1997.

         In  the  discussion  which  ensued  from  the  poll  of individual
         members, questions  were  raised  concerning inequity  of  detail;
         land-use incompatibility, the casting  of shadows and the  jarring
         scale across the mews, which might result  from the combination of
         a 24-storey tower  and 4-storey building; the  depth of footprint;
         and the envelope.   While cognizant of the  need for more  detail,
         the Committee RESOLVED

         THAT CHAPC support  in principle the proposed rezoning application
         for  a  multi-level  care  facility  fronting  Carrall  Street  in
         Block 17; and

         FURTHER  THAT the rezoning application  for a market housing tower
         in  Block 17 be supported in principle, pending specifications and
         drafting of the by-law. 

   Staff and the  applicant met  with the  committee on March  11, 1997  to
   review  the market  housing  proposal, in  response  to the  Committee s
   previous comments.  CHAPC felt their concerns were met with the proposed
   CD-1 by-law and supplementary guidelines.

   PERMITS  AND LICENSES DEPARTMENT: The Industrial Waste Management Branch
   has cleared  the previous  rezoning on the  basis that  B.C. Environment
   find the proposed side  remediation plan to be acceptable.   Council has
   previously  approved that  the City  will undertake  remediation of  the
   site.

   FIRE  DEPARTMENT: The site plan for the  two buildings proposed has been
   reviewed, with the following issues identified:

   For the market housing  building - there must be an error on the drawing
   for  the CRU on  the ground floor  because it is shown  with an internal
   door leading into the garage, and  an interior stairs that goes up  into
   the dwelling units.

   Aside  from this,  the  more serious  code  issue are  the three  storey   townhouses off the 2nd  floor podium.  They do  not comply with VBBL  on
   exiting requirements.  The applicant  is advised to consult with Permits
   and Licenses or to discuss this with a code consultant.

   As  for the  care facility, they  will have  to comply  in full as  a B2
   occupancy building.

   Planning staff note  that plans for the market  component are conceptual
   only.  The comments, which pertain to the building permit stage, will be
   flagged for the future developer.

   HEALTH DEPARTMENT:   The City s  acoustical criteria shall form  part of
   the  Zoning  By-law,  and  an Acoustical  Consultant s  report  shall be
   required which assesses  noise impacts on the site  and recommends noise
   mitigating measures.  If a  Community Care Facility (adult or childcare)
   is proposed,  plans will have  to be submitted for  approval to C.C.F.L.
   The Noise Control By-law does not require amendment.

   CPTED  REVIEW: This site is located in  a high crime impact environment.
   Environmental  design should reduce  opportunities for theft  from auto,
   bicycle  theft,  break and  enter  and  mischief  such as  graffiti  and
   skateboarding.   Designs  that make  places  feel safer  should also  be
   considered.

   Phase 2a (Care Facility):  

   -  design development  to reduce opportunities for  mischief in the exit
      stairwell located on Carrall Street;

      (NOTE TO APPLICANT:   This can  be achieved  by locating exit  stairs
      within the building with a flush door to the exterior.)

   -  design development to reduce opportunities for graffiti;

      (NOTE TO  APPLICANT: Graffiti  is prevalent in  the downtown and  its
      removal  is  an  expense  to  building  owners  and strata  councils.
      Opportunities  for graffiti  can be  mitigated  by reducing  areas of
      exposed wall, by covering these walls  with vines, hedges, lattice or
      steel mesh, or  by using a protective coating  material.  Contact Ms.
      Helen  Chomolok,  Graffiti   Coordinator  at  873-7162   for  further
      information and resource.)

   -  design development to reduce opportunities for break and enter;

      (NOTE TO  APPLICANT:   Ground  level  units  have shown  to  be  most
      susceptible to  break and  enter.   Opportunities can  be reduced  by
      deleting  areas of concealment outside of  doors, windows and patios,
      by raising  the units  slightly above street  grade and by  providing
      additional electronic security and hardware to these units.)

   -  design development  to improve security and visibility in underground
      parking areas in  accordance with Section 4.12 of  the Parking By-law
      and  provision to  paint the  walls  and ceiling  of the  underground
      parking areas white.

   Phase 2b (Market Housing):

   Key issues relating to this phase are:

   -  theft in the  underground and  separation of  use in  the parking  to
      ensure no crossover of users;

   -  podium level break  and enter with  the grand  stairs leading to  the
      podium;

   -  defensible design for street level residential;  i.e., like 888 Beach
      Avenue (a.k.a. 1500 Hornby Street) in Downtown South,

   -  lack of  surveillance of  the gated  walkway where  it meets  Carrall
      Street; and

   -  ensuring no unclaimed areas where mischief can occur.

   SENIORS' ADVISORY COMMITTEE  COMMENTS: On November 29, 1996, the Special
   Advisory Committee  on Seniors  endorsed the  following comments  on the
   Phase 2 rezoning applications:

   1. There appears  to be little concern for the effects that this project
      will  have  on  Phase  1  of  this  project  (S.U.C.C.E.S.S.  Seniors
      Housing).   The amount of shade that  is cast by the tower in Phase 2
      onto  the  housing units  in  Phase  1  will seriously  affect  their
      liveability.    The  shade  diagrams  depict  shadows  in  March  and
      September,  which  are not  the  worst  times of  the  year.   Shadow
      diagrams  for   December  would   be  even   more  severe  than   the
      March/September ones shown.

      In May of this year, the  Seniors  Advisory Committee expressed their
      concerns to the planners and architect of Phase 1 about the  security
      of  the  seniors (and  families) who  live in  Phase  1 and  who were
      required to  enter and  exit their housing  from Canton Alley  rather
      than being  provided with a more  secure entrance/exit off  of Taylor
      Street.  Now our security concerns  have increased because we realize
      that Canton  Alley will also  be in shadow  a great  deal of the  day
      because of the placement of the Phase 2 tower.  In  addition, many of
      the units that face into  the alley will not get little  sunlight and
      moreover,  the roof terrace will also be  in shade for a greater part
      of the afternoon.

   2. The  proposed outdoor  public  space, Shanghai  Square,  will have  a
      great deal of trouble functioning as such for two reasons:

      a)   its primary function is  that of a turnaround serving to  relieve
           the congestion caused by  the two way traffic coming from  Taylor
           Street and the  24-storey Phase 2  tower and the one  way traffic
           (northbound) on the northern portion of Shanghai Alley.

           Having the  parking entrance and exit  to the 24-storey tower  on
           Shanghai  Alley  detracts  from  using   Shanghai  Square  as   a
           ceremonial space.   Whereas it may  be possible to close a street
           for a number of  hours, it would be  unreasonable to suppose that
           people would accept  being denied access to their parking  spaces
           associated with their homes for that length of time.

      b)   Shanghai  Square will be  in shade for most  of the afternoon, so
           is only really useable as an outdoor space in the morning.

   3. The Committee  would like  to see more  details concerning the  Adult
      Care that is offered.

   4. Landscaping provided is minimal.

   The applicant  has responded to  point 1 [see  Applicant s comments   on
   Pages 10 and  11 of this Appendix].  Planning staff note that originally
   envisioned as a  public plaza  area  in a previous rezoning application,
    Shanghai  Square  is effectively  a traffic servicing  turnaround which
   will have extremely limited or no use for events.  Agreement amongst all
   serviced by Shanghai Alley will be necessary for even temporary closure.

   URBAN DESIGN  PANEL: The  Urban Design Panel  reviewed this  proposal on
   November 6,  1996 and  supports the  proposed use,  density and  form of
   development.

   The following is an extract from the Minutes of the Urban Design Panel:

    EVALUATION: SUPPORT (9-0)

   -   Introduction:   The Rezoning Planner,  Rob Whitlock,  presented this
       proposal  comprising two  applications representing  separate phases
       of  the  project.    The  first  phase  (2A)   comprises  a  100-bed
       multi-level care facility  to be administered by S.U.C.C.E.S.S.  The
       second phase (2B) is a market  housing development of  approximately
       200 units,  at a density  of 4.1  FSR and  a height  of 24  storeys.
       Provision  for  commercial  retail  use   along  Keefer  Street   is
       included.  At this  time, it is not known which phase of the project
       will  proceed  first.    Mr.  Whitlock  briefly  reviewed  the  site
       context.

   -   Applicant's Opening  Comments:  John  Davidson, Architect, described
       the  proposal.   He  noted the  care  facility will  likely  proceed
       before  the   residential  component,  although   they  are   to  be
       considered together.  

   -   Panel's Comments:   After reviewing  the model and posted  drawings,
       the Panel commented as follows:

       The Panel unanimously supported  these rezoning applications and was
       in general  agreement with  the proposed massing and  positioning of
       the elements on the site.

       In general, the direction  presented for the care facility was  well
       received and the Panel liked  the detailing shown in the lower scale
       buildings.    One  Panel  member commented  that  while  the Carrall
       Street faáade is broken down quite well and  successfully echoes the
       typical  scale of  Chinatown, the  entry should  read  more clearly.
       The proposal  to shift the administrative  functions to the  Carrall
       Street side  to  align with  the adjacent  buildings was  supported;
       however, moving any of  the residential units any closer to  Carrall
       Street as well was not recommended.

       With  respect  to  the  residential  tower,  the  Panel  recommended
       setting  it back  from Taylor  Street  above the  7th or  8th storey
       level.   Some Panel members  also supported  a higher  tower with  a
       smaller floor plate, noting the tendency for larger  floor plates on
       a  one-tower  scheme  such  as this.    Greater  use  of  brick  was
       encouraged.

       The Panel supported the proposed  alignment of Shanghai Alley, which
       it was noted  takes better advantage of views into the park and back
       into the site.  Concerns were expressed about  materials in Shanghai
       Alley,  with a  strong recommendation  to use  something better than
       the  proposed  asphalt.  The  Panel  agreed  with  the  proposal  to
       eliminate trees from the alley, as long as views to green  space are
       assured.

       Regarding  the lane  that runs  along  the north  side of  the  care
       facility, one Panel member suggested allowing  extra floor space  in
       the  existing  building  so that  it  overhangs  the  lane,  and  to
       encourage improvements to that building s faáade.

       The Panel supported the  landscape plan and liked the central  space
       with the turnaround.

       Doorways opening  onto  Taylor Street  were recommend  by one  Panel
       member.

       One Panel member questioned whether  it is historically  appropriate
       to  be surrounding this  project with trees.   While a double row of
       trees along  Keefer will be  an improvement,  it was suggested  they
       should thin out more towards Chinatown.

   -   Applicant's  Response:  Mr.  Davidson   noted  the  tower  has  been
       developed  beyond  the  stage  normally  required  for  a  rezoning,
       however, he agreed with the Panel s comments about  the setback from
       the  street and more  careful delineation  of the  7-storey element,
       which could be  part of the guidelines.  He added, the floorplate is
       actually smaller  than  the  floorplate allowable  on  International
       Village.   With respect to  the lane at the  north of  the site, Ms.
       Anne Bancroft-Jones  of the City s  Real Estate  Division, explained
       they are in discussions with the owner to the north. 

   COMMENTS OF THE APPLICANT: The applicant  has been provided with a  copy
   of this report and has provided the following comments:

   Special Advisory Committee of Council on Seniors

    As you are requested, we  contacted Gillian Watson-Donald to review her
   memo  dated November  20, 1996  regarding  the comments  of The  Housing
   Subcommittee of The  Seniors  Advisory Committee.  Ms. Watson-Donald did
   not have her notes in front of her but recalled the key issues as:

   -   overshading  both  the  seniors   housing  windows  and  the  office
       building terrace;
   -   security  concerns  re  Canton  Alley,  possibly  increased  due  to
       shadowing;
   -   conflicts  of  traffic   movement  and   possible  public/ceremonial
       activities in Shanghai Alley; and
   -   visibility  of resident bedrooms from the nurses  station within the
       care facility.

   We discussed these  matters openly and  in a positive  way.  Our  mutual
   objective is to make Block 17, as a whole, a pleasant and  safe place to
   work and to live.  Our comments on the specific points noted in the memo
   are:

   1.  We too are  very concerned about shadow impacts within Block 17.  As
       you know, we studied several  alternative configura-tions and  tower
       locations  for Phase  2b and  recommended the  proposed location  to
       maximize the solar  access to both Phase 1 and 2.  Canton Alley is a
       very narrow space and, as a result the adjacent building tend  to be
       shaded  much of the  time.  While  the tower  does cast  some shadow
       into Canton Alley between approximately 11:00 a.m. and  1:00 p.m. at
       the  equinox,  a  building  of  one  half, or  even  one  third, the
       proposed  height would  have  a similar  effect.   Shadows  cast  in
       Canton Alley prior to  11:00 a.m. and after  1:00 p.m., result  from
       the  S.U.C.C.E.S.S. Social  Services and  the CBA  Housing buildings
       themselves.  The S.U.C.C.E.S.S. roof terrace is shaded  by the tower
       from approximately  1:00  p.m.  to 3:00  p.m.  at the  equinox.    A
       shorter building,  or a tower in  another location, would have  much
       the same effect.

       We cannot comment on the security of the seniors housing entrance.

   2.  In the  current application, the  primary purpose  of Shanghai Alley
       is  to  provide  access to  the  adjacent  buildings.   The  Phase 2
       portion of  Shanghai Alley will  occupy a R.O.W.  over the  Phase 2a
       and 2b  properties.  The closing  and/or ceremonial use of  Shanghai
       Alley  will,  therefore,  be  at  the  discretion  of  the  adjacent
       property owners.  Discussions with the  sponsoring groups and  other
       community  associations  have  emphasized  the  importance  of  site
       safety and security.  As a result, Shanghai
       Alley  has   been  carefully  limited  by  the  extent  of  adjacent
       properties,  and  the  proposal  does  not  include  the significant
       public  gathering  space  identified   as  Shanghai  Square  in  the
       original submission.

       Shanghai Alley  will include  a paved  road surface,  curbs/ gutters
       and sidewalks  on both side  for the safe  passage of vehicular  and
       pedestrian traffic.

   3.  The Adult Day Care  program may be defined as  the care facility  is
       developed in detail.   Space in currently  set aside for  future use
       when funding is available.

   4.  The  landscape plan included in the rezoning package illustrates the
       conceptual development  of the  streetscape  and  the common  spaces
       related  to Phase 2a and 2b.  These ideas will be refined as part of
       the Development Permit process.

   We trust this illustrates our  intentions and adequately responds to the
   Housing Sub-Committee s concerns.

   The following points  respond to comments from the  Engineering and Fire
   Departments:

   Engineering Issues

   1.  A  private roadway  system will  be constructed to  connect Shanghai
       Alley and Taylor Street.

       Cost sharing agreements will  be signed between  the property  owner
       (City) and the lessee (Ministry of Health).

       i)    Attached drawing shows the various dimensions.  Note that  the
             northbound portion  of Shanghai Alley will comprise 9.592 m of
             lane and  0.60 m R.O.W. on the property  to the west (Phase 1)
             for a total clear dimension of 10.192 m and a reduction of the
             pavement from 6.10 m to 5.922 m.

       ii)   Sidewalks  with curbs  and  gutters  will  be  constructed  in
             Shanghai Alley.

       iii)  Street lighting will be provided in Shanghai Alley.

   2.  It  will  be important  for  the  housing  site  to  be permitted  a
       demountable  canopy over the  drop-off area.  No other encroachments
       into the  R.O.W. are  expected and  nothing will  encroach over  the
       travel surface of Shanghai Alley.

   3.  So as not to give the impression  of a public walkway, the reference
       to Shanghai Mews will be removed from the plans.

   4.  Zoning  for  Phase 2b  will specify  a maximum  gross area.   Future
       development  will  determine  the  number  of  housing  units  as  a
       function  of  target  market,  configuration of  units,  etc.    The
       limitation  of  200  units  related to  existing  sewer  capacity is
       acknowledged.

   5.  (i)   Parking for the care facility will be provided on the basis of
             1  space per 6  beds for staff  plus 1  space per 10  beds for
             visitors, as a minimum.

       (ii)  Agreement  on parking  ratios for  the housing  site has  been
             reached between Properties and Engineering.          6.  The  drop-off loop  at Shanghai  Alley will  be  used for  passenger
              loading for  the care  facility.   For larger  vehicles (e.g.,  mini
              buses), the underground service and parking areas will  be available
              for passenger loading.

          7.  The  off-street loading  space for  the housing  site  is shown,  at
              grade adjacent to the entrance, on the attached drawing.

          8.  Bicycle parking  and storage  will be  provided as  required at  the
              time of DPA.

          9.  The plan has  been revised to illustrate the sidewalk  configuration
              required to  accommodate a lay-by.   If  a lay-by is  desired by the
              developer, a  volumetric easement will  be necessary  to accommodate
              the sidewalk.

          10. The  drop-off/turnaround  loop  has  been  redesigned  per  attached
              drawing.   Paving in the loop  will be differentiated from  Shanghai
              Alley over the hatched area.

          11. Pavement in the loop is 6.0 m minimum width.

          12. Existing  R.O.W.  will  be  modified  to  accommodate  the  proposed
              configuration of Shanghai alley and the drop-off loop.

          13. The parking ramp system on the housing site can be modified  to meet
              engineering requirements.  This should be a DPA issue.

          14. The parking arrangement on the  care site has been modified as shown
              on  the attached  drawings to  meet the  ramp  slope and  transition
              criteria.

          15. A  garbage compactor  will  be  provided on  the  care site  and  is
              expected  on  the  housing site.    Private  collection  service  is
              anticipated.

          16. The allocation  of Taylor Street  improvement costs  will be defined
              in the zoning legal agreements.

          17. Streetscape work on City  property will be considered in the  zoning
              legal agreements and defined during the Development Permit process.

          18. Shanghai  Alley  will  have  asphalt  pavement  and  concrete curbs,
              gutters and sidewalks consistent  with item 17 above.  The  drop-off
              loop  will have  special paving.   All  to be  approved by  the City
              Engineer.

          19. Services will  be underground. Phases  1 and  2b will be  separately
              serviced.

          20. The site Service Agreement will be completed  as part of the  Zoning
              Enactment process. 

          Fire Department Issues

          1.  If commercial space is  provided on the lowest level, there will not
              be stair connections as shown.   If the lowest level is residential,
              the stair will connect to  the level above,  within each unit.   Any
              openings into  the parking  garage  from  residential or  commercial
              space will  be either by way  of a common  corridor or  a vestibule.
              The detail is  not shown on the current plans which are intended for
              general illustration purposes only.

          2.  The  sectional drawing  through the  Keefer  Street building  is not
              fully detailed.   The design  configuration will  meet VBBL  exiting
              requirements.   Considering  the  residential podium  as  acceptable              open  space   for  exiting,  the  design  will  comply  with Article
              3.3.4.3 of the VBBL.

          3.  The care facility will be designed in full compliance with  the VBBL
              as a B2 occupancy. 


                                     FORM OF DEVELOPMENT
























































                                    DRAFT CD-1 GUIDELINES                                     599 CARRALL STREET
                                    (PHASE 2b - BLOCK 17)



















































          APPLICANT, PROPERTY, AND DEVELOPMENT PROPOSAL INFORMATION

          APPLICANT AND PROPERTY INFORMATION

             Street Address          599 Carrall Street
             Legal Description       Lot 2, Block 17, D.L. 541, Plan 10212

             Applicant               Robin Hall, Davidson Yuen Simpson Architects

             Architect               Davidson Yuen Simpson Architects
             Property Owner          City of Vancouver             Developer               Phase 2a - S.U.C.C.E.S.S; Phase 2b - (not known at this
                                     time)


            SITE STATISTICS

                                      GROSS            DEDICATIONS                NET
             SITE AREA               7 410 m2               -                  7 410 m2


            DEVELOPMENT STATISTICS
                                   DEVELOPMENT                                   RECOMMENDED
                                 PERMITTED UNDER      PROPOSED DEVELOPMENT     DEVELOPMENT (if
                                 EXISTING ZONING                               different than
                                                                                  proposed)

             ZONING                   BCPED                   CD-1

             USES                    Various        Multiple Dwelling,
                                                    Special Needs,
                                                    Residential, Commercial

             DWELLING UNITS            N/A          Approx. 200 market
                                                    dwelling units and 100
                                                    bed multi-level care
                                                    facility
             MAX. FLOOR SPACE          N/A          Phase 2a - 1.78           Phase 2a - 1.8
             RATIO                                  Phase 2b - 4.10

             MAXIMUM HEIGHT            N/A          Phase 2a - 3 storeys/14
                                                    m
                                                    Phase 2b - 24 storeys/70
                                                    m
             PARKING SPACES       As per Parking    As per Parking By-law,
                                      By-law        with a residential
                                                    parking rate of 0.4
                                                    spaces per dwelling unit
                                                    plus 1 space per 100 m2
                                                    GFA



            R:\CC\REPORTS\COUNCIL\MAY6\P2.