ADMINISTRATIVE REPORT

                                                      Date: March 11, 1997 
                                                      Dept. File No. H392-3
                                                      CC File No. 1602-1   

   TO:       Vancouver City Council

   FROM:     General Manager of Engineering Services

   SUBJECT:  1997 Engineering Basic Capital Budget



   RECOMMENDATION

        A.   THAT the 1997 Streets, Sewers, Waterworks, Street Lighting and
             Communications  Basic Capital  Budgets, as  reported here  and
             detailed in Appendix 1,  be approved with funding as  shown in
             Table  1, with  the Capital from  Revenue portion,  subject to
             approval of the 1997 Operating Budget.

        B.   THAT the transfer of Capital Funds, as detailed in Appendix 2,
             for  Streets,  Sewers,  Traffic  Signals  and  Yards   Capital
             closeouts be approved.

        C.   THAT the public sewer connection fees for 1997 be increased by
             approximately 1.7% as shown in Appendix 3.

        D.   THAT  the Director of Legal Services be requested to amend the
             Plumbing    By-Law   in    accordance   with    the   approved
             recommendations in this report.


   COUNCIL POLICY

   In  November 1996, Council approved the 1997-1999 Capital Plan which set
   a level of funding for specific Capital programs over those three years.
   Voters  approved  borrowing  authority  for the  Public  Works  portion,
   excluding the Sewers and Waterworks Capital Plans, which are approved by
   Council.  

   Funding  from the Capital Plan is allocated to specific capital programs
   through  annual Capital Budgets.  Funding for the annual Capital Budgets
   is provided  from a combination  of borrowed funds,  as approved  in the
   plebiscite, and revenue funds, with the revenue portion being subject to
   approval  of  Capital from  Revenue in  the  Operating Budget.   Council
   approval  of the  annual  Capital Budget  is  required before  work  can
   proceed on specific projects.
                                    - 2  -


   Closeouts  of  completed  Capital  projects  whose  expenditures  exceed
   $50,000 and 15% of the approved budgets, require Council approval. 

   In  June 1995,  Council directed  departments to  use CityPlan  to guide
   policy decisions, corporate work priorities, budgets and Capital Plans.

   Major policies for Engineering Services Programs are summarized below:

   STREETS

        Bicycles/Greenways
        The Vancouver Comprehensive Bicycle Plan (1988), the Clouds of
        Change Report (1990), the City-wide Bicycle Network (1992) and
        the recent Greenways Program, established the City's policy of
        promoting   and  encouraging   cycling  as   a  transportation
        alternative.    On  July  18th,  1995,  Council  approved  the
        Vancouver-Greenways  Plan.   This plan  supports environmental
        initiatives  such  as  Clouds  of  Change  and  Council's  top
        transportation priorities (approved in  CityPlan), pedestrians
        and bicyclists.  Greenways also  addresses the growing need on
        the part  of communities to have a voice in the design and use
        of the urban landscape.

        Sidewalks
        It is Council policy  to give sidewalks high priority,  and to
        provide walks on:

           - both sides of arterial streets;
           - one or both sides  of pedestrian collector routes as
             required;
           - both  sides  of all  streets  in  multiple dwelling,
             commercial and industrial zones;
           - in residential areas as requested by petition; and
           - adjacent   to  parks,   schools  and   other  exempt
             property, as funding allows.

        Safety and Congestion
        The  City has a policy of improving safety at intersections by
        constructing  left-turn  bays,  subject  to a  review  of  the
        design.

        Neighbourhood Traffic Controls
        The  City  has  a  policy of  protecting  neighbourhoods  from
        short-cutting with the  installation of traffic  controls such
        as traffic circles, diverters,  right-in/right-outs, etc.

                                    - 3  -

   STREET LIGHTING

        The Safer City  Task Force indicated the  importance of making
        people  feel  more secure  and  taking  proactive measures  in
        providing  appropriate street  and  bus  shelter  lighting  to
        protect people  from  violence. The  Infill  Lighting  program
        funds  the   improvements  to   low  levels  of   lighting  on
        residential streets and bus shelters. 


   SEWERS

        In the early 1970's, Council approved the policy of separating
        sanitary  and  storm  sewers  starting  in  the  West End  and
        Downtown  areas in  order  to begin  reducing and  eliminating
        combined sewer overflows.

        In  1981,  the  above-noted  policy was  reaffirmed  with  the
        adoption  of the  1% life cycle  replacement policy  for sewer
        mains as part of the Sewers Long Range Capital Plan.

        Both  of  these policies  were reaffirmed  in the  1991 Policy
        Report on the Vancouver s   Design and Service Level Standards
        for Sewer Collection Infrastructure , and have been reaffirmed
        as part of every Capital Plan since, including 1997-99.

        CityPlan direction  is  to make  environmental improvements  a
        priority in  decision-making with particular attention  to air
        and  water quality.  One  CityPlan step is  to reduce combined
        sewage overflows to surrounding  water bodies by continuing to
        separate storm runoff and sewage systems.

   WATERWORKS

        In September  1996, Council approved the  1997-1999 Waterworks
        Capital  Plan, which was  based on  the Waterworks  Long Range
        Plan  (LRP).  The LRP and Capital  Plan focus on the issues of
        uniform  replacement of  aging infrastructure,  replacement of
        water services and meters, system capacity and fire protection
        improvements, emergency  preparedness, and other works such as
        new water service installations.  

        In  April  1992,  Council  approved the  construction  of  the
        Dedicated Fire Protection  System, including saltwater pumping
        stations,   a  downtown  distribution  grid,  and  a  pipeline
        extension  to  Kitsilano,  subject  to   funding  approval  in
        subsequent capital plans.


                                    - 4  -


   SUMMARY AND PURPOSE

   This  report provides Council with  an overview of  the 1997 Engineering
   Department Basic Capital Budget, including submissions for: 

                  Streets             $ 21,641,000
                  Communications      $    465,000
                  Street Lighting     $  1,540,000
                  Sewers              $ 16,660,000
                  Waterworks          $ 23,100,000


   The General  Manager of Engineering  Services will report  separately on
   the details of the installation and updating portion of the 1997 Traffic
   Signal Program to the Vancouver Transportation & Traffic Committee.

   The 1997 Basic  Capital Budget allocates approximately one-third  of the
   funds  in the  1997-1999 Capital  Plan approved  by Council  in November
   1996.

   In addition, this report includes Capital account closeouts for Streets,
   Sewers, Traffic Signals and Yards, as detailed in Appendix 2.


   CANADA/B.C. INFRASTRUCTURE PROGRAM EXTENSION

   The  City  has   received  notice  from   the  Federation  of   Canadian
   Municipalities  that the  Federal government  has made  an offer  to the
   Provinces to extend the Canada Infrastructure Works Program through $425
   million  in new  federal funding.    About  $50 million  of this federal
   funding  could  be expected  to  go  to British  Columbia.     With  the
   Provincial  and  local  governments each  contributing  their  one-third
   share,  this would  provide  $150  million  in  total  funding  for  our
   province.    This  compares to  $675 million in  total funding  that was
   provided for the current program.    Preliminary details of the proposal
   to extend the Infrastructure Program were reported to Council on January
   28, 1997, in the  General Manager of Engineering Services  report titled
   "Canada Infrastructure Works Program Extension".

   With the  current Infrastructure Program, Vancouver  received awards for
   $14 million  dollars in transportation and  sewers (hard infrastructure)
   projects.     One of  the key  requirements in  the guidelines  for this
   program is  that the municipal  share of projects  must be in  excess of
   existing  capital budgets  or  at least  represent accelerated  funding.
   Accordingly, the City s one-third share of our awards was funded through
   a special  $10 million dollar  infrastructure borrowing authority.   The
   City s share  of funding for an  extended program would be  subject to a
   report back to Council.





                                    - 5  -


   PROVINCIAL GOVERNMENT GRANTS

   The 1997-1999 Capital Plan  assumed no Local Government Grants  from the
   Provincial  Government  for  Streets, Sewers  and  Waterworks  projects.
   Although annual  awards for Sewer  and Waterworks projects  between 1989
   and  1992 averaged about  $3.7 million a  year, since 1993,  we have not
   received any awards. 

   Annual awards  for  streets projects,  between 1989  and 1992,  averaged
   about $1.4 million a year.   The City received no Local Government Grant
   funding in 1993, 1995 and 1996.  In 1994, the  City received $600,000 in
   Local Government Grants for four projects. 

   In 1995  and 1996 the City  expressed concerns, to both  the Minister of
   Municipal Affairs and ministry  staff, about the sudden drop  in funding
   from the Local Government  Grant Program.  However,  to date, there  has
   been no announcement for applications for a 1997 program.

   In  1996,  the City  received $938,000  in  Provincial grants  under the
   Cycling Network Program.  These grants are allocated to projects such as
   the Cypress  Street Bike  Corridor, upgrading  the BC  Parkway/7-11 Bike
   Route,  the 37th Avenue Bike Route, the  Kent Avenue Bike Route and four
   other  projects  in the  City s  Cycling Network  Program.   Due  to the
   uncertainty  of this  funding in  the future,  only $500,000  in Cycling
   Network Program funding was assumed for the 1997-99 Capital Plan.


   PROJECT DETAILS

   The 1997 Engineering  Basic Capital Budget includes  five programs which
   are  summarized in this report,  and described in  detail in Appendix 1.
   The programs  are Streets,  Communications, Street Lighting,  Sewers and
   Waterworks. 

   The funding for the 1997 Traffic Signal Program ($3,655,000) is included
   in the 1997 Streets Capital  Budget and details of this program  will be
   dealt with independently by the Transportation and Traffic Committee  in
   early 1997.

   This is the first year of the 1997-1999 Capital Plan.  


   A.   STREETS                                   1997 Budget  $ 21,641,000

   The 1997 Streets  Capital Budget is  comprised of  a number of  programs
   which address Council's Capital and Transportation Priorities.   A brief
   description of the Streets programs follows:

   Infrastructure                               $3,225,000 

   Includes reconstruction of arterial streets and local streets which have
   deteriorated to  the point  where normal  maintenance is not  effective.
   Also included in this category is the major maintenance of City bridges,
   including concrete repairs and joint replacement.



                                    - 6  -


   Pedestrians, Bicycles & Greenways            $4,131,000

   Deals  with  the  construction of  new  sidewalks  and  curb ramps,  and
   sidewalk  reconstruction  (both cost-shared  with  property  owners, and
   fully City funded).   Cycling improvements include: bikeway links  along
   Heather  Street  and  Lakewood  Drive,  extension  of  the  37th  Avenue
   Greenway/Bikeway and the development  of the Kent Avenue  Bike Corridor.
   This  program also  includes  further development  of the  City Greenway
   Network.

   Traffic Signals                              $3,655,000

        Renovate & Replace Plant         $ 500,000
        Includes    ongoing    replacement    of     traffic    signal
        infra-structure.

        1997 Traffic Signal Program      $ 720,000
        Details of the 1997 Traffic Signal program, which includes the
        installation and updating of traffic signals, will be reported
        separately to  the Transporta-tion & Traffic  Committee by the
        General Manager of Engineering Services.

        Traffic Signal Management
        System Upgrade (phase 1)         $2,000,000
        This is the first phase of a two-year phased implementation of
        upgrading the Traffic Signal Management System. Upgrading will
        allow for the expansion  of the TSMS to control  1,200 traffic
        signals and  allow flexibility  in signal controls  to service
        responses  to  pedestrian  and  cyclist  service  calls,   bus
        priority  pre-emption   for   HOV  lanes,   designated   route
        pre-emptions for emergency vehicles, and allow for the ability
        to communicate with other systems in the Lower Mainland.

        Modifications to Existing Signals  $435,000
        Includes modifications, upgrading  and retrofitting  exist-ing
        traffic  signals,  including  pedestrian  indicators,  audible
        signals and left-turn phasing.


   Transit & Safety Improvements                $3,245,000

   Projects  in this section deal with implementing HOV Lanes and left-turn
   bays  to enhance transit operations and reduce delays, and also includes
   other roadway changes to improve safety and reduce  shortcutting through
   neighbourhoods. A major transit  corridor such as Main Street  or Fraser
   Street will  be  chosen for  the construction  of bus  bulges and  other
   measures  to improve  transit  travel time.    The 1997  Capital  Budget
   provides the overall funding  for this area and the  individual projects
   are  reported  to  Council  for  approval  after  a  public notification
   process. Also  included in this program are arterial local improvements,
   bus shelters and bus slabs and landings.



                                    - 7  -



   Local Area Traffic Plans
   and Other Improvements                  $4,285,000

   Provides  for the  installation  of neighbourhood  traffic controls  and
   construction of  streets and  lanes by  Local Improvements petitions  or
   initiatives.  


   Major Projects                          $3,000,000

   Provides funding for capital projects in the City.  In  1997, funding is
   required to  fund the purchase of  the CP Rail False  Creek Corridor for
   the Downtown Heritage Railway.



   B.   COMMUNICATIONS                     1997 Budget      $465,000

   The  City's communications  system  is  made  up  of  Fire,  Police  and
   Engineering radio dispatch  systems as  well as  a communications  cable
   network.    An  effective  communication  system  is  essential  to  the
   efficient operation of these  departments.  This system is  essential to
   all  aspects of  emergency  response and,  therefore,  it must  have  an
   eminent degree of survivability.  

   The 1997 Capital  Budget contains  funding for the  continuation of  the
   Underground  Cable  Plant  replacement  and expansion  programs.    Also
   included  is funding  for the  replacement  of parts  of  the City  Hall
   switchboard.



   C.   STREET LIGHTING                    1997 Budget    $1,540,000

   As with all City infrastructure, the  street lighting plant is aging and
   many  components are  now  past  their  estimated  service  life.    The
   1997-1999  Capital Plan provides a comprehensive, ongoing infrastructure
   replacement program  for street lighting.   It emphasizes infrastructure
   replacement  programs such as street lighting  poles, service panels and
   conduit.    The Capital  Plan  also  addresses  street lighting  outages
   through rebuilding some electrical connections and control panels.

   Funding is provided for coordination of street lighting relocations with
   other  utility companies  replacement programs,  the City's share of new
   lighting projects  approved through  the local improvement  process, and
   addressing local public safety concerns brought forward through both the
   Safer City Task Force and community interaction.  









                                    - 8  -



   D. SEWERS                                        1997 Budget $16,660,000

   The Sewers program includes the following:


   System Replacement                      $15,540,000

   Consists of the  renewal of sewer  mains, connections, manholes,  street
   drains  and pump stations.  Factors considered in selecting the projects
   in this  category are: replacements for  physical failure, deterioration
   from  age,  inadequate  capacity  and  related  flooding  problems,  and
   environmental benefits.

   The  City  has adopted  a strategy  of  continuous sewer  replacement to
   replace 1% of the existing sewer system  over a 100 year life instead of
   periodic large  reconstruction programs.  The benefits of  this strategy
   include:

        -    it avoids crisis funding and spreads the  cost of Capital
             replacement works to taxpayers more evenly over time;

        -    provides for continuous environmental improvements;

        -    maintains a stable, well trained workforce;

        -    maintains  an  adequate level  of  service  in sewers  by
             providing for the  ongoing, timely  replacement of  older
             sewers and thus reducing the  risk of sewer collapse  and
             sewage flooding of private residences and businesses; and

        -    meets the City's combined sewer overflow (CSO) management
             goal of  gradual reduction and eventual  elimination over
             about 60 years.


   The City's ongoing commitment  to the sewer separation program  has been
   one  of the key  factors in the  Province's support for  our approach to
   dealing with CSO's.   It may also have  been a significant consideration
   in the  Province's decision to stay charges against the GVRD for ongoing
   CSO's at the Clark Drive outfall.


   System Management                       $210,000

   Consists  of   projects,  data   collection  and  analysis   to  support
   cost-effective capital work programs. 

                                    - 9  -

   D. SEWERS (continued)

   Pollution Abatement                     $610,000

   Consists of pollution abatement projects such as the Inflow/Infiltration
   Reduction Program and the Sewer Separation on  Private Property Program.
   Work in 1997 would include ongoing development of City's sewer strategy,
   planning at the regional level on  the Liquid Waste Management Plan, and
   further pollution reductions through  inflow/infiltration work and sewer
   separation on private property.


   Sewer Connection Fees for 1997

   Fees  for public sewer connections are reviewed annually and adjusted as
   necessary to reflect actual costs incurred in the previous year  as well
   as expected inflationary increases in the next year.  Accordingly, a fee
   increase  of  approximately  1.7%  is recommended  for  1997  (refer  to
   submission D-1, Part 3 in Appendix 1 and Appendix 3 for details).


   E.   WATERWORKS                         1997 Budget $23,100,000

   The  Waterworks  1997-1999  Capital  Plan  was  approved by  Council  in
   September  1996, with  increased  annual expenditures  compared to  past
   Waterworks  budgets.  This  funding was intended to  address a number of
   significant  deficiencies  in  the  Waterworks system.    The  1997-1999
   Capital Plan is based  on the Waterworks Long Range  Plan (LRP), updated
   with our more recent Storage and Transmission Optimization (STOR) work.

   Implementation of the  Long Range  Plan was  initially planned  to be  8
   years, but  was extended to  12 years  to reduce  its financial  impact.
   Subsequent  coordination with the  GVRD, through  the STOR  project, has
   also resulted in deferral of the storage (reservoir) project  envisioned
   in the  LRP  to  begin  construction  during this  Capital  Plan.    The
   1997-1999  Capital  Plan reflects  this  change  and proposes  watermain
   projects  which  are required  independent of  whether  or not  the city
   ultimately  builds its own emergency storage facilities.  The results of
   our STOR study will be reported to Council during 1997.

   The 1997 Waterworks Capital Budget is composed of the following:


   Aging Infrastructure Replacement        $12,100,000

   This program consists of:  replacement of pit cast iron, lined cast iron
   and  steel pipes; reconstruction of PRV stations which control the water
   pressure  in the City's eight pressure zones; replacing water meters and
   service pipes that  have worn out  due to corrosion; and  replacing fire
   hydrants.   In combination with  other programs, this  work results in a
   replacement  rate  of about  1.5% per  year,  as necessitated  by system
   aging.


                                    - 10  -



   E.   WATERWORKS (continued)

   Addressing Growth                       $3,300,000

   This program involves the replacement or extension of transmission mains
   in  various areas throughout the  City to address  pressure and fireflow
   problems,  due to  historic  and continuing  City  and Regional  growth.
   Funding   is  also   included   for  cost-shared   distribution   system
   improvements to  accommodate specific  developments' local  water system
   improvements.


   Emergency Planning                      $6,100,000

   The majority  of funding  in this  category is  for  the Dedicated  Fire
   Protection  System (DFPS).    Previous Capital  Budgets have  funded the
   design  and  construction  of the  False  Creek  and  Coal Harbour  pump
   stations and  the design and  construction of the  first portion  of the
   downtown  high pressure distribution pipe line system.  The 1997 program
   proposed  the  construction  of  the  remaining  one-third of  the  high
   pressure pipe line required  to connect the False Creek and Coal Harbour
   pump stations, site selection and design for the Kitsilano pump station,
   and engineering review of  the DFPS distribution system design  prior to
   proceeding with  the next phase, and  the supply of a  third hose tender
   support vehicle for the Fire Department.

   The  DFPS was originally envisioned  as an 8-year  project, beginning in
   1992,  based on desirable construction scheduling.  This was extended to
   12 years for funding reasons.

   Minor funding is also included  in this category for the  evaluation and
   development  of other  alternative  water supplies  such as  groundwater
   sources, and access to Fraser River water.


   Other Works                             $1,500,000

   The  main  components  of  this  program  include the  installation  and
   replacement   of  telemetry  (monitoring)  equipment,  construction  and
   replacement  of  mains  prior   to  paving  or  on  short   notice,  and
   installation  of new services  and meters.   As of this  year, new water
   services  are  funded  by  the City  only  when  they  are required  for
   residential fire sprinkler installations for secondary suites.  This has
   reduced the "New  Services and Meters" portion of the  budget from $1.75
   million/year  (1996) to $600,000 (1997).   Since the  preparation of the
   1997-99  Waterworks   Capital  Plan,   $600,000  in  funding   has  been
   reallocated from PRV Stations to the Discontinuing of Old Water Services
   section  of  New Meters &  Services  in recognition  of reduced revenues
   from discontinuing old services.

                                    - 11  -

   FUNDING

   As  shown in  Table 1,  funding for  Streets, Communications  and Street
   Lighting is partially from Operating Budget revenues  and partially from
   borrowing  authority  approved  by  voters  in  the  November  16,  1996
   plebiscite.    Funding  for  Sewers  originates  from  Council  approved
   borrowing authority, and Waterworks  is a Council approved, self-funding
   utility with debt financing through water rates revenue.

   There are  several projects  contained in the  1997 Engineering  Capital
   Budget,  such as  bike  routes, traffic  signals, neighbourhood  traffic
   plans,  etc.,  that will  require various  forms  of maintenance  in the
   future.  Increases  that may  be required to  the Engineering  Operating
   Budget  for  these  maintenance  items  will  be  identified  with   the
   individual projects as they are reported to Council.

                                     TABLE 1
                                         000'S DOLLARS

            Program               1997-99              1997            Remaining       1997 Funding From
                                            Funding            Budget            Funds          Borrowing      Revenue
                                            
      Streets                $ 55,980        $21,641         $ 34,339       $18,641       $ 3,000     


      Communications         $      960       $                                                                      $      495     $     465     $ 0
                                             465                                                

      Street Lighting        $   4,373        $ 1,540                                                             $   2,833      $  1,540      $ 0

      Sewers                 $ 49,717        $16,660         $ 33,057       $16,660       $ 0


      Waterworks             $ 74,100         $23,100                                                             $ 51,000       $23,100       $ 0


                                                                                                                     
      Total Engineering      $185,130         $63,406                                                            $121,724       $ 60,406      $ 3,000



     CAPITAL CLOSEOUTS

   Every year,  Capital projects are  reviewed to determine which  ones are
   complete and to identify accounts that can be closed out.   Closeouts of
   completed Capital projects involving  transfers between Capital accounts
   of $50,000  and 15% of  the budget, or  more, require  Council approval.
   Appendix 2  provides a summary  of the Streets, Sewers,  Traffic Signals
   and Yards  closeouts, including  a calculation of  their under  and over
   expenditures,  respectively.  The  transfers requiring  Council approval
   are noted.



                             *   *   *   *   *    



                                  APPENDIX 3



                    Sewer Connection Fee Increases for 1997


                                         Current
                                                         Recommended
                                           Fee           Fee  -   1997     

   Public Sewer Connection Fees for
   One & Two Family Dwellings...........  $ 4,240         $ 4,310


   Public Sewer Connection Fees for
   other than One & Two Family 
   Dwellings:

       4 inch/100mm Diameter............. $ 5,540         $ 5,630
       6 inch/150mm Diameter............. $ 6,680         $ 6,800
       8 inch/200mm Diameter............. $ 7,560         $ 7,690
      10 inch/250mm Diameter............  $ 8,730         $ 8,880
      12 inch/300mm Diameter............  $ 9,920         $10,090
      15 inch/375mm Diameter............  $11,090         $11,280


   Manhole installed in conjunction 
   with a Public Sewer Connection........ $ 3,330         $ 3,390


   Connections greater than 
   15 inch/375mm Diameter................ $11,090         $11,280


   New Fittings - Twin Sewer............. $ 2,050         $ 2,080

   New Fittings - Single Sewer........... $   890         $   910
   Inspection fee for Connection
   to a Public Sewer..................... $   115         $   120




                     *   *   *   *   *