SUPPORTS ITEM NO. 4(b) P&E COMMITTEE AGENDA OCTOBER 10, 1996 ADMINISTRATIVE REPORT Date: October 1, 1996 TO: Standing Committee on Planning & Environment FROM: General Manager of Engineering Services SUBJECT: 1997/98 Conceptual Transit Service Plan RECOMMENDATION A. THAT Council receive for information the 1997/98 Conceptual Service Plan, and request the Vancouver Regional Transit Commission to provide an opportunity for the municipalities to comment on specific proposed service changes in the Annual Service Plan in advance of its approval. B. THAT the Vancouver Regional Transit Commission concentrate the allocation of new resources for the 1997/98 Annual Service Plan in the City of Vancouver in order to deal with historical under-funding and service cutbacks, with the following focuses: - Service to the high density Riverside/Fraser Lands/Champlain Heights South, and North Shore False Creek areas - Overcrowding/passups and schedule reliability - Granville Rapid Bus - including consideration of letting Vancouver riders board the existing suburban buses at the major transfer points on Granville Street, in advance of introducing the full RapidBus concept - A general route restructuring and innovative fare policy for Vancouver s Central Area, including introduction of the following routes: West End Loop Central Broadway To Downtown Loop the local Downtown Vancouver portion of the North Burnaby transit changes COUNCIL POLICY Council's priorities for transportation modes are walking, cycling, transit, goods movement, and the automobile. Council supports measures to increase transit use as a means of reducing the impacts of general vehicular traffic growth and improving regional air quality, as per the "Clouds of Change" initiatives. Council has approved a number of requests for transit service improvements including a package of service design guidelines and additional routes, as described in appendix A. PURPOSE This report discusses BC Transit s conceptual service plan for next year. BACKGROUND Each year BC Transit prepares a report to the Vancouver Regional Transit Commission (VRTC) that outlines the proposed changes to transit service in the Region for the coming fiscal year. Once approved, the report is used to prepare the budget. Normally the report is prepared in the fall and forwarded to the municipalities for comment prior to a final decision by the VRTC in November. This year, however, a Conceptual Service Plan has been prepared which contains no details on transit changes proposed for each municipality. Instead, the plan outlines the concepts and directions to be followed in producing the detailed Annual Service Plan for approval in November. This Annual Service Plan will be the first of five annual plans that implement BC Transit s current Five year Plan and Funding Strategy. The Five Year Plan is discussed in a companion report. On September 11 1996, the VRTC approved the conceptual plan and directed BC Transit to: circulate the plan to municipalities and other stakeholders for review and comment, and bring forward a detailed Annual Service Plan in November 1996. 1997/98 CONCEPTUAL TRANSIT PLAN The plan proposes a 4% increase (140,000 hours) in annual transit service at an annual cost of $8.4 million. As itemized in Appendix B, additional resources would be concentrated in three main areas: 1. Improve Services in the Growth Concentration Area (GCA) About 60% of the increase will be used to improve the quality and reliability of existing services in the GCA. The GCA comprises Vancouver, Burnaby, New Westminster, North Surrey, North Delta and the North East. The report singles out Vancouver for particular attention in this allocation of service, but there is no indication what portion of the new resources the City would receive. 2. Improve Services on Regional and Commuter Routes About 20% of the new service would be used to improve frequencies on existing routes between Downtown Vancouver and the outlying communities, and between Regional Town Centres. 3. Local Area Plans, New routes and Other Transit Services About 15% of the new service would be for improvements outside the GCA, based on conducting local area plans. BC Transit proposes several other minor improvements including the reallocation of resources from low to high productivity service products. NEED FOR MORE INFORMATION BC Transit has provided a concept plan rather than a detailed Annual Service Plan for review. This change in process essentially eliminates formal municipal input and is not appropriate. It is important the City be able to comment on the detailed plan, as general concepts can be misinterpreted. For example, BC Transit s recent controversial proposed service cuts on busy routes in the City were described as Productivity Improvements, which they were not. In view of the lack of details, it is recommended that Council simply receive the Conceptual Service Plan for information, and request BC Transit to provide an opportunity for the City to comment on specific proposed service changes in the Annual Service Plan in advance of VRTC approval. NEED FOR NEW SERVICES It is important the City inform BC Transit of its service needs and priorities, notwithstanding the lack of information. An encouraging aspect of the plan is that it represents a change from the policy during the last fifteen years of adding new resources to the outlying suburban areas while reducing service in Vancouver. As discussed in previous reports, transit services in the City were reduced in the early 1980's. In view of the history, a significant majority of the new service in the plan should be allocated to the City. The establishment of service should have four main focuses, based on the improvements requested previously by Council in Appendix A: - Provide Service to High Density Areas - Appropriate transit service is required for the high density residential areas in Riverside/Fraser Lands/Champlain Heights South and on the North Shore of False Creek. - Overcrowding/Passups and Schedule Reliability - The existing transit system should be made to work well. Therefore, reducing overcrowding/passups, and improving schedule reliability (e.g. missed or late trips) should be a priority. - Granville RapidBus - This project has been put on hold as part of the Provincial capital spending freeze. However, the planning phase should be initiated. In addition, consideration should be given to establishing a similar inexpensive interim service by adjusting the regular suburban services to allow Vancouver riders to board existing express buses at major transfer points. - General Route Restructuring and Innovative Fare Policies for the Vancouver Central Area - This would include introducing the West End Loop, the Local Downtown Vancouver transit portion of the North Burnaby transit changes, and the Central Broadway to Downtown service. * * * * * APPENDIX A - Page 1 of 5 SELECTED COUNCIL REQUESTS FOR CONVENTIONAL TRANSIT SERVICE (I.E. NOT INCLUDING RAIL TECHNOLOGY, OR SPECIAL SERVICES FOR THE DISABLED) The Vancouver Regional Transit Commission (VRTC) was requested to receive the following for input into the BC Transit study on Service Design Guidelines (reaffirmed Feb 22, 1996): A.1 That the current network of Owl Service routes be specified in the Service Design Guidelines. A.2 That the minimum frequency during peak periods for primary urban routes be changed from 15 minutes to 10 minutes. A.3 That the minimum frequencies on evenings, Sundays and holidays for secondary urban routes be changed from 30 minutes to 20 minutes. A.4 That the maximum average load for each transit route in the peak AM and PM periods, measured over the most crowded three consecutive buses, be 2.5 standing persons per square metre (i.e., about 60 passengers in total or 22 standees on a City trolley bus). A.5 That the maximum load for one individual trip in the published bus timetables in the peak AM and PM periods be 4 standing persons per square metre (i.e., about 70 passengers total, or 32 standees on a City trolley bus.) A.6 That pass-ups (fully-loaded buses passing by transit patrons waiting at a bus stop) not be permitted, in so far as it is possible to schedule trips to avoid this. A.7 That BC Transit provide a regular report to the VRTC on the number of pass-ups by time period for each service. A.8 That BC Transit initiate a comprehensive study to identify alternatives and costs to improve the peak period crowding and pass-up situation for major routes in the City. A.9 That the maximum off-peak load be 1.0 standing passenger per square metre (i.e., 8 standees on a City trolley bus). A.10 That the maximum passenger standing time in off-peak periods be five minutes. A.11 That a minimum cost recovery standard for transit services be investigated for application in the Greater Vancouver Region as part of BC Transit's review of alternative productivity indices and data requirements. APPENDIX A - Page 2 of 5 A.12 That 99.8% of all bus trips operate in their entirety (i.e., only 2 misses or unscheduled short turns in 1,000), to be applied individually to each specified service run in the published bus timetables. A.13 That an appropriate set of on-time guidelines be developed applicable to each service run in the published bus schedule. A.14 That the VRTC approve guidelines for the following: - Vehicle interior maintenance and cleanliness. - Rate of acceleration/deceleration and magnitude of "jerk" (eg., gear changes, etc.). - Air circulation and humidity. A.15 That the success rates in achieving these guidelines be reported at regular intervals to the VRTC. A.16 That all buses in the Region provide sufficient internal on-board lighting (eg., for passenger security, reading, and negotiating the aisle in the early morning and at night) in order to illuminate at least 80% of the passenger area. The items below were forwarded to BC Transit and/or the Vancouver Regional Transit Commission for input into the appropriate transit planning and operations processes (B1 to F3 reaffirmed or approved February 22, 1996): B1. That BC Transit and City Engineering staff undertake an ongoing program of improving personal safety conditions at transit facilities (including stations, bus loops and stops) in Vancouver, and report to Council as necessary on additional costs. B2. That more detailed data be collected (e.g., through the use of operators and on-board automatic data recording devices) regarding ridership, maximum loadings, reliability, etc., in order to improve the decision making process for an efficient transit system and to apply the service design guideline recommendations above. B3. That better field supervision be provided (potentially including the introduction of an Automatic Vehicle Location and Control [AVLC] system on selected routes) to control the positions of buses on the street network to meet the guidelines above, and for security purposes. APPENDIX A - Page 3 of 5 B4. That improved public information systems be provided, including: - maximum 5-minute wait for telephone transit information. - consideration of innovative public timetable designs, eg., including travel time information and simplified format. - improved driver training for customer relations. - posted route information at appropriate bus stops. B5. That transit service on heavily used corridors (e.g., Broadway) be expedited with proof-of-payment systems (i.e., loading at both doors for passengers with transfers) and "move to the rear" programs to better balance loads, reduce crowding, and decrease pass-ups. B6. That bicycles carried by external bus racks be permitted on appropriate routes. B7. That the City's previous requests for the following service improvements be confirmed: - West End Loop - to provide a Downtown/West End shuttle, and reduce the impact of downtown disruptions on the Main and Fraser Street services. - North Shore False Creek service. - Southeast Vancouver extension - to serve new high density residential land use in the Fraser Lands/Riverside area. - First Avenue Service. - Stanley Park - service extension into the park. - Evening and Sunday operation of the #1 service (or alternative, see recommendation B12 below) on Beach Avenue. B8. That the planned new express services on Granville Street and Broadway be implemented as soon as possible. B9. That the potential for other new express routes in the City be investigated. B10. That guidelines be developed to evaluate potential express routes, including a minimum productivity measure and a travel time savings warrant. APPENDIX A - Page 4 of 5 B11. That articulated buses for selected City transit services be acquired as soon as possible in advance of the current schedule for the trolley fleet replacement program, in order to reduce on-board crowding levels. B12. That economical small bus operations be implemented in the City where service has been withdrawn: - in Vancouver Heights/Bridgeway (e.g., Cambridge Street). - on Beach Avenue in the evenings and Sundays. - in West Point Grey/UBC - (the #42 service will be discontinued on Sundays, except in summer). B13. That economical small bus/van services be considered in low-density areas beyond 450 metres from existing routes (eg., Southlands), for Community Bus Routes designed for the elderly, or for innovative Route Deviation (e.g., Dial-a-Bus) services in off-peak times. B14. That BC Transit expedite its review of the potential for low-floor buses in Vancouver for completion prior to the purchase of new vehicles for the Regional fleet. C1. That BC Transit be requested to use electrified trolleys as much as possible on West End routes. D1. That the #22 Knight/Macdonald service be extended to Dunbar Loop (previously reaffirmed by Council on January 13, 1994). D2. Council, on January 14, 1992, supported a BC Transit concept for improved service to the Vancouver International Airport including direct service to the Downtown, and better evening and weekend service for the #100 route. E1. That the North Burnaby transit changes not include a reduction in local service on Hastings Street and Broadway. E2. That the Vancouver Regional Transit Commission request BC Transit to reinvestigate the potential to provide a more economical minibus service than the service that has been proposed, in order to serve the low-ridership and special-needs areas of the City and Region; E3. That BC Transit be urged to add appropriate signage to bus destination sign rollers, or to electronic signs located at the front of buses indication "FULL - BUS FOLLOWING". APPENDIX A - Page 5 of 5 E4. THAT Council request the Vancouver Regional Transit Commission and BC Transit to expand the minibus program proposed by BC Transit to include routes in Vancouver and, in the meantime, to look into other provisions, i.e., Van Pools, to ensure communities are not isolated due to the lack of transit. F1. THAT BC Transit be asked to consider a West End Routing that includes a Davie, Denman, Robson and Homer/Richards or Pacific Boulevard loop trolley service. F2. THAT BC Transit develop options for a new route linking Central Broadway, the Downtown and Waterfront Station. F3. THAT BC Transit consider providing more innovative fare policies in order to encourage ridership, such as group based discounts for educational, other government and major employment institutions. F4. Council on June 20, 1989 requested the Vancouver Regional Transit Commission to consider further the adoption of: - a fourth fare zone including a review of Tsawwassen in the fourth zone; - differential zone fares in the off-peak with off-peak fares less than the peak fares; - Downtown Loop fare zone.