RR-2(ii)
                             ADMINISTRATIVE REPORT

                                            Date: May 30, 1996

    TO:       Vancouver City Council

    FROM:     General Manager of Engineering Services

    SUBJECT:  Review of Engineering Services Infrastructure Programs
              in Preparation for the 1997-1999 Capital Plan


    RECOMMENDATION

         A.   THAT the Capital Plan and Long Range Plan Update reports in
              Appendix 1. - Water, Appendix 2. - Sewer and Appendix 3. -
              Street Lighting & Undergrounding, be considered by Council
              and the Staff Review Group in the preparation of the
              1997-1999 Capital Plan.

         B.   THAT the City pursue with the Greater Vancouver Water
              District the adoption of permanent lawn sprinkling
              regulations.

    COUNCIL POLICY

    General

    In June 1995, Council directed departments to use CityPlan to guide
    policy decisions, corporate work priorities, budgets and Capital Plans. 
    Although there is no specific direction in CityPlan for the replacement
    of infrastructure, the direction for Financial Accountability calls for
    the efficient delivery of City services.

    Water

    The City water system operates as a utility, with costs recovered
    through its rates and fees, and borrowing approved by Council.

    In March 1993 Council approved the implementation of a City water
    conservation program, and adopted the GVRD Water Shortage Response Plan
    to regulate lawn watering during the summer months.

    In July 1993 Council approved the 1994-1996 Waterworks Capital Plan,
    based on the Waterworks Long Range Plan (LRP).  The LRP was presented
    to Council for information in 1992.

    The CityPlan direction for Clean Air & Water calls for expanding water
    conservation programs.

    Sewer

    In the early 1970's, Council approved the policy of separating sanitary
    and storm sewers to begin reducing and eliminating combined sewer
    overflows.

    In 1981, the above-noted policy was reaffirmed with the adoption of the
    1% life cycle replacement policy for sewer mains as part of the Sewers
    Long Range Capital Plan.

    Both of the above sewer policies were reaffirmed in the 1991 Policy
    Report on Vancouver's  Design and Service Level Standards for Sewer
    Collection Infrastructure .

    The CityPlan directions for Clean Air & Water and Vancouver and the
    Region, call for making environmental improvements a priority in
    decision-making, in part by reducing combined sewage overflows to
    surrounding water bodies by continuing to separate storm runoff and
    sewage systems.

    Street Lighting

    The Safer City task Force indicated the importance of making people
    feel more secure and taking proactive measures in providing appropriate
    street and bus shelter lighting to protect people from violence.  

    The CityPlan direction for Working Together to Promote Safety calls for
    including better street lighting at transit stops.

    Streets

    Bicycles/Greenways

    The Vancouver Comprehensive Bicycle Plan (1988), the Clouds of Change
    Report (1990), the City-wide Bicycle Network (1992) and the  Greenways
    Program (1995), established the City's policy of promoting and
    encouraging cycling as a transportation alternative.  

    Safety and Congestion

    The City has a policy of improving safety at intersections by
    constructing left-turn bays, subject to a review of the design.

    Neighbourhood Traffic Controls

    The City has a policy of protecting neighbourhoods from short-cutting
    with the installation of traffic controls such as traffic circles,
    diverters, and right-in/right-outs etc.

    PURPOSE

    The purpose of this report is to provide Council with information on
    Engineering Services' water, sewer ,street lighting and streets
    infrastructure programs. This report also gives Council an opportunity
    to provide feedback on these programs to the Staff Review Group, that
    will be considering submissions for the 1997-1999 Capital Plan.  A
    recommendation regarding lawn sprinkling regulations, which forms a key
    part of the strategy for the   Capital Plan for water, is also
    included.

    BACKGROUND

    The infrastructure works programs for water, sewer, street lighting and
    communications, and streets are a major component of the City's
    expenditures.  Funding approved in the 1994-1996 Capital Plan was as
    follows: 

         Waterworks          -    $ 51,620,000
         Sewers              -    $ 42,520,000
         Street Lighting &   -    $  6,928,000
         Communications
         Streets & Bridges   -    $ 58,588,000
                                  $159,656,000

    Overall, these programs accounted for about 70% of the $229,650,000 in
    total funding provided in the 1994-1996 Capital Plan.

    All components except water form part of the base Capital Plan for
    which Council has established a $175 million financial limit. Program
    and project expenditure submissions will be reviewed as part of the
    staff review process, with recommended funding levels forming part of
    the draft plan to be submitted to Council in July.


    Waterworks submissions will also be considered by the Staff Review
    Group, however that consideration will be outside the financial limits. 
    In consultation with the Director of Finance and the General Manager of
    Engineering Services, the Review Group will recommend a set of projects
    and an appropriate funding level.  This recommendation will give
    consideration to the City's needs and the capacity of the water utility
    to absorb an increase in debt charges.

    In preparation for the work that will be done by the Staff Review Group
    , staff from Engineering Services and Finance have discussed the
    process for arriving at these recommendations.  It was agreed that it
    was important to update Council on major replacement programs such as
    sewer and water.  It was also recognized that any comments from Council
    on these programs would be helpful input for the Staff Review Group. 

    DISCUSSION

    Engineering staff have prepared detailed reviews which are appended to
    this report for Engineering's water, sewer and street lighting
    infrastructure programs.  Each appendix provides a review of the
    program's history, objectives,  accomplishments and recommended
    strategies.  This report also contains a brief overview of the streets
    program.  The communications program has not been included, since it is
    currently the subject of a consultants' study which will be reported on
    separately. 

    General

    Engineering's programs for water, sewer, street lighting and streets
    infrastructure are fundamental and essential functions for public
    health and safety, environmental protection and the economic well being
    of the City.  In Vancouver the infrastructure for these facilities is
    almost fully developed.  As a result, the emphasis of our Capital Plans
    is on ensuring this infrastructure is replaced or upgraded as
    necessary, to maintain existing levels of service and accommodate
    growth.

    The City's infrastructure has a limited life, and must be replaced
    continually in an efficient and cost effective manner.  Our replacement
    strategy is based on the following criteria:

    -    replace infrastructure at a time that minimizes total costs
         (operating, capital, and liability)
    -    maintain a relatively stable and skilled workforce
    -    equalize expenditures to stabilize funding requirements

    This strategy has allowed the City to avoid problems experienced in
    other North American cities.  Some cities have found themselves in the
    situation where they face extensive investment requirements and
    financing difficulties, as a result of deferring replacement and
    upgrading until a crises situation develops.  The labour applied to
    these projects is  inefficient because of the short, intense duration,
    and this has a negative impact in retaining the specialized skills that
    are necessary from both City and private sector crews.  Accordingly, it
    is not surprising that effective infrastructure replacement programs
    are one of the key items considered when reviews are done for the
    City's credit ratings.

    Water

    The average life expectancy of our water system's components is
    approximately 70 years.  A uniform infrastructure replacement program
    at a rate of 1.5% of the value of the system per year will provide
    relatively constant funding needs as well as the ability to effectively
    manage the maintenance of the water system.  During the 1994 - 1996
    Capital Plan we replaced about 0.9% of the system per year.  Although
    less than our 1.5% goal, this was significantly better than our 0.5%
    replacement rate during the 1980's.  The 1997 - 1999 Capital Plan
    proposal includes funding to attain 1.5% annual replacement.  This is
    proposed through increasing transmission main replacement, which was
    deferred during 1994 - 1996 due to a lack of senior government
    cost-sharing.

    The proposed 1997 - 1999 Waterworks Capital Plan will generally
    continue to follow the principles and timing contained in the 12-year
    implementation of the Waterworks Long Range Plan (LRP).  The most
    significant proposed change is with respect to the construction of
    City-owned storage, which has been deferred from the 1997-1999 Plan by
    optimizing City and District transmission projects (a $17.4 million net
    deferral).  As a result, it is proposed that infrastructure replacement
    funding be increased to meet our 1.5% goal, rather than continue a
    reduced infrastructure program to help accommodate funding the storage
    project.  The Dedicated Fire Protection System and other alternate
    water supplies for emergency preparedness are proposed to continue in
    accordance with the LRP schedule.

    In addition to undertaking capital improvements to address system
    deficiencies, the City is working aggressively to manage water demand
    through conservation initiatives.  These have had very positive
    results, reducing average per capita demand from as high as 178 gallons
    per day (in 1987) to 141 gallons per day (in 1995),  and reducing peak
    hour demand for the whole City from about 200 million gallons per day
    (prior to 1992) to about 150 million gallons per day (since 1992).  The
    peak hour demand has been significantly reduced by lawn sprinkling
    regulations, which permit only half the City to sprinkle on any
    watering day.  To ensure that historically higher peak demands do not
    recur, we are recommending permanent adoption of the sprinkling
    regulations throughout the GVWD.

    Sewer

    Vancouver's sewer infrastructure is comprised of 1,800 kilometers of
    main sewers, 27 pumping stations, 100,000 property connections, 45,000
    street drain connections, and 25,000 manholes.  In order to maintain
    the system, a comprehensive capital replacement program is necessary. 
    The main sewer portion of the infrastructure is a key component of the
    system.  The life expectancy of new main sewers is about 100 years,
    which forms the basis for Vancouver's 1% per annum life cycle main
    sewer replacement policy.  This policy has been effective in preventing
    serious collapse of sewers as well as addressing flooding problems
    throughout the City.  In addition, it is a major factor in the City's
    pollution abatement program with regard to sewage overflows to
    Vancouver's local water bodies.  

    Environmental issues are now becoming more of a concern to the general
    public.  Because a large portion of Vancouver's sewer system is still a
    combined system (a single pipe in the street which carries sewage and
    stormwater mixed together), sewage overflows occur during significant
    rainfall periods.  With the City's ongoing 1% main sewer replacement
    program, the combined system is gradually being replaced with a two
    pipe system to separate the sewage from the stormwater.  This results
    in a continuous reduction and eventual elimination of our sewage
    overflows.  This program is also in accordance with Provincial policy
    and objectives.   A new Liquid Waste Management Plan is being developed
    for the region and is expected to form new Provincial regulations
    regarding our combined sewage overflows.  Our program is expected to
    significantly reduce the need for much larger capital expenditures to
    deal with these overflows.  In addition, as sewer separation proceeds,
    ground water inflow from building drain tiles and other storm systems
    will be eliminated from the sanitary system.  This will result in a
    reduction in dry weather flows to the Iona Sewage Treatment Plant,
    which will reduce Vancouver's annual Regional District sewerage levy.

    The program follows CityPlan directions by making environmental
    improvement a priority, with particular attention to water quality. 
    The CityPlan direction for Financial Accountability is also
    complemented. The program's strategy of selective replacement of the
    most deteriorated and inadequate sewers, combined with timely and
    effective maintenance, has worked well over the last decades.  We  have
    been able to provide the required service to the citizens as well as
    pollution abatement benefits at a minimum and equitable cost.

    Street Lighting

    As with all city infrastructure, the street lighting plant is aging and
    many components are now past their estimated service life.  All street
    lighting components have a 2% replacement rate.  The previous Capital
    Plan recognized that a 2% replacement rate required a considerable
    increase in budget and workforce.  Accordingly, the 1994-1996 Capital
    Plan approved an infrastructure replacement program based on a 1%
    replacement rate, with an inspection program to identify the highest
    priorities.  The 1997 - 1999 Capital Plan continues with the direction
    established in the previous Capital Plan and requests funding for a 1%
    replacement rate.

    The 1997-1999 Capital Plan emphasizes infrastructure replacement
    programs such as street lighting poles, service panels and conduit. 
    Funding is proposed for coordination of street lighting relocations
    with other utility companies replacement programs, and for the City's
    share of new lighting projects which are approved through the local
    improvement process.  This Capital Plan also continues the successful
    Infill Lighting program which addresses public safety concerns
    regarding localized lighting issues brought forward by residents, the
    Safer City Task Force, CityPlan and other community programs such as
    Greenways and Bikeways.

    Undergrounding

    It has been Council's policy and practice to provide a 1/3 funding
    level for undergrounding projects along with 1/3 funding from the
    utility companies and 1/3 funding from the property owners.  Streets
    undergrounded include Beach Avenue, Georgia Street, Upland Drive, and
    N.W. Marine Drive.  Generally, three to five projects are submitted
    over the life of a Capital Plan. 

    Streets

    Transportation policy has evolved over the years to meet the demands of
    vehicular, bicycle and pedestrian traffic modes.  The future
    Transportation Plan being developed now, will continue to ensure
    infrastructure is in place to be consistent with the goals of City
    Plan, Transport 2021, and public need.  The street system will continue
    to be required to evolve to effectively accommodate the various traffic
    modes while minimizing costs of both capital works and maintenance.

    The city street system is an integral part of the transportation system
    in the city and is the most visible of the city's infrastructure
    components.  The street system, which currently measures 1187    kilometres, has evolved as the city has grown.  Few new streets are
    being created, but changes to streets are required to meet the demands
    of redevelopment.  The street system is dynamic and must respond to
    changing travel needs, safety, public demands, increasing vehicle
    loading, and unstable soils.  Maintenance can accommodate some of these
    pressures, but in order to extend the life of existing streets and
    sidewalks, and meet the changing needs and expectations of a growing
    city, a capital investment must continue to be made.

    Streets are facing pressure for change and improvement to:

    (a)  the street layout to accommodate pedestrians and cyclists, calm
         traffic in neighbourhoods and improve arterial safety;

    (b)  the road structure, to meet the increasing demands of heavier
         vehicle loading particularly buses; 

    (c)  the sidewalk structure to respond to tree root impacts; and 

    (d)  the general condition of streets and sidewalks, which has
         deteriorated over the past 10 years.

    The 1997-99 Capital Plan would balance the need to increase the level
    of infrastructure funding in some areas with reductions in others, and
    respond to new programs and demands.  The major focus of this report is
    to identify how the 1997-99 Capital Plan would ensure basic
    infrastructure does not deteriorate further.

    Arterial street improvements are being requested for a few locations,
    primarily major transit corridors where bus delays can be reduced or
    safety can be improved.  Several innovative transit projects are being
    discussed with BC Transit, and can begin implementation over the next 3
    years.

    Local and arterial street reconstruction funding is required to respond
    to the accelerating deterioration of pavements.  Most streets were
    constructed many years ago, to meet then current standards of the low
    cost paving program, and are now wearing out from higher traffic loads
    and volumes.  To help reduce future concerns, construction methods and
    materials are being improved and engineered pavements are more common. 
    Pavement technology is changing and innovative pavement design can
    reduce rutting and extend the life of the asphalt pavements.  A new
    category in this Capital Plan would see pavement research efforts
    increased in order to develop longer lasting, better life cycle cost
    streets by incorporating more cost effective materials and methods. 

    Seismic upgrading and improvements to bridges and major structures will
    decrease as this infrastructure is now in relatively good condition,
    compared to streets, following expenditures in past Capital Plans. 
    Only the Burrard Bridge approach spans have not been fully upgraded to
    be serviceable after an earthquake.  Funding for this project is
    proposed in this Capital Plan.

    A major increase is being requested to respond to pedestrian and
    bicycle infrastructure, including $11 million for Greenways.  Although
    the number of sidewalk reconstructions and local improvements remain
    stable, cycling, and pedestrian improvement funding requests are
    higher.  Increased tree planting and street greening is desirable, but
    further work needs to be done to address the impact of tree roots on
    sidewalks.  Sidewalk damage is resulting from more new street trees, a
    tenfold increase in the last seven years, and the maturation of
    existing trees.

    Local street reconstruction remains stable while traffic calming
    funding increases to meet neighbourhood requests.  The Residential
    Streets Program, piloted on Garden Drive, is in its infancy and the
    added flexibility, is expected to change the look of local
    improvements. 

    The Residential Lane Local Improvement Program, which surged in the
    1970's has dropped to a stable level in recent years, however, the
    failure of lanes constructed 25 years ago is emerging as a future
    infrastructure demand. To meet this need, reconstruction local
    improvements are being considered, as is done with sidewalks.

    There are two Special Projects, the Powell Street Grade Separation near
    Raymur Street and the Downtown Heritage Railway, proposed for this
    Plan.  The grade level rail crossing at Powell Street is rated a high
    priority by the National Transportation  Authority (NTA), based on
    national standards used to assess safety. The Grade Separation would
    reduce the daily conflicts among the 16 trains and 32,000 vehicles at
    the existing crossing.  The Downtown Heritage Railway project would
    provide funding to help construct and begin operation of the streetcar
    system along the existing 6th Avenue rail line and First Avenue.

    All of the above works attempt to maximize the useability and safety of
    the infrastructure while beautifying the city with additional
    landscaping and street trees.  While the demands on the program
    continue to increase, there is also the need to maintain the existing
    street infrastructure for public use in a cost effective manner that
    minimizes future maintenance.  The proposed  1997-1999 Capital Plan for
    streets is intended to serve both these needs.


                 *     *     *     *     *