APPENDIX 2 - to Council Report

1997 to 1999
Engineering
Capital Budget

Close-Outs

Appendix 2

CAPITAL ACCOUNT CLOSURES

STREETS

To close and balance the accounts for the 1997 to 1999 Streets Capital Closeout, the following summary has been prepared. The accounts being closed represent projects which commenced prior to the year 2000, and for which, as a group, funding and expenditures occurred over a number of years. Accordingly, no direct comparison exists between the closeouts and the 1997 to 1999 Streets Basic Capital Budgets.

This Streets Capital Closeout summary completes the accounting for streets construction work involving expenditures of $68,554,525 This money funded various projects including traffic calming, street reconstruction, Local Improvement street paving and curbing, lane paving, sidewalk construction, a variety of left-turn bays, property acquisition and minor street alterations. The City funding for this work was $68,537,754 resulting in an over-expenditure of $16,771 (approximately 0.02%).

Explanations are included for account groups which have variances of more than the established limit of 15% and $50,000. As well, explanations have been included for individual projects that have variances in excess of this limit.

PROVISION OF FUNDS

After completing the projects covered by this closeout, funding of $16,771 is required. It is proposed that this be provided from existing approved funds in the 2000-2002 Streets Capital Account Group set aside for Grading & Opening Streets and Lanes (SCA5G-UNAP).

1997-1999 Capital Plan Close-out

     

STREETS

       
         

Capital Budget Program

 

YTD Actual

 

 

 

 

as of

Unexpended

Variance

 

Total Budget

March 31, 2003

Balance

Percentage

Infrastructure

$

$

$

 

Repair Arterial Streets

6,987,000

6,447,619

539,381

7.72%

Repair Local Streets

766,000

678,483

87,517

11.43%

Major Maintenance - Struc

10,834,000

10,475,090

358,910

3.31%

Pavement & Materials Rese

200,000

200,308

(308)

(0.15%)

**** Streets - Infrastructure

18,787,000

17,801,500

985,500

5.25%

         

Pedestrian & Bikes

       

New Sidewalks

986,925

894,092

92,833

9.41%

Sidewalk Reconstruction -

1,331,547

1,619,771

(288,224)

(21.65%)

Sidewalk Reconst - Part B

1,639,225

1,599,191

40,034

2.44%

Curb Ramp Program

1,000,000

1,000,001

(1)

(0.00%)

Bicycle Network

3,639,960

3,692,833

(52,873)

(1.45%)

Beautification & Street T

204,813

226,989

(22,176)

(10.83%)

Pedestrian & Other Struct

439,750

168,826

270,924

61.61%

Greenways

956,076

1,082,763

(126,687)

(13.25%)

Miscellaneous Projects

57,000

53,210

3,790

6.65%

**** Pedestrians & Bikes

10,255,296

10,337,676

(82,380)

(0.80%)

         

Transit & Safety

       

Arterial Improvements

12,178,374

11,097,189

1,081,185

8.88%

Aging Uncurbed Arterials

340,681

121,284

219,397

64.40%

Bus Slabs & landings

695,000

650,232

44,768

6.44%

Property Fund - Transit/S

642,300

668,689

(26,389)

(4.11%)

**** Transit & Safety

13,856,355

12,537,394

1,318,961

9.52%

         

Local Area Traffic

       

Neighbourhood Traffic Co

1,438,250

1,593,877

(155,627)

(10.82%)

Higher Zoned Streets

1,423,747

1,842,871

(419,124)

(29.44%)

Residential Streets

5,098,491

5,525,844

(427,353)

(8.38%)

Higher Zoned Lanes - Loc

225,271

184,482

40,789

18.11%

Residential Lanes - Loc

1,987,428

2,066,329

(78,901)

(3.97%)

Drainage & Utility Reloc

675,782

691,361

(15,579)

(2.31%)

Grade/Open Streets & Lan

86,200

55,479

30,721

35.64%

Minor Property Acquisiti

8,794

8,794

0

0.01%

Traffic Circles / Speed

6,980

19,574

(12,594)

(180.42%)

Miscellaneous Projects

675,200

712,858

(37,658)

(5.58%)

*****Local Area Traffic & Other

11,626,143

12,701,467

(1,075,324)

(9.25%)

         
         

Capital Budget Program

 

YTD Actual

 

 

 

 

as of

Unexpended

Variance

 

Total Budget

March 31, 2003

Balance

Percentage

Major Projects

       

Downtown Heritage Railway

10,125,500

10,881,561

(756,061)

(7.47%)

Other Projects

1,161,000

1,155,502

5,498

0.47%

*** Major Projects

11,286,500

12,037,062

(750,562)

(6.65%)

         

Other Charges

(217,061)

(4,500)

(212,561)

97.93%

Other Charges 1994-96

(396,609)

-

(396,609)

100.00%

Other Charges 1997-99

3,340,130

3,143,925

196,205

5.87%

*** Other Charges

2,726,460

3,139,425

(412,966)

(15.15%)

TOTAL STREETS CAPITAL

68,537,754

68,554,525

(16,771)

(0.02%)

         

Proposed allocation of funding to be carried forward to the 2000-2002 Plan

   
         

Funding from the 2000-2002 Unappropriated Account - Grade/Open Street Lanes (SCA5G-UNAP).

 

Total

   

(16,771)

         

Explanations are provided where variances are greater than $50,000 and 15% of the budget as follows:

Order Group

 

Total Budget

YTD Actual as of March 31, 2003

Unexpended Balance

Variance Percentage

1997-1999
Infrastructure

           

C07A1A0004

Knight St: Various Locati

1,090,000

1,263,696

(173,696)

-15.94%

Unanticipated costs occurred on this pavement reconstruction project due to a cave-in at 63rd Avenue. This subsidence required extra protection for safety reasons, followed by extensive backfilling. Also more expensive experimental sbs and eva polymer asphalts were used on this project to test their effectiveness.

 
 
           

C07A1A0011

SW Marine: Cedarhurst-Car

100,000

206,816

(106,816)

-106.82%

During the reconstruction of this section of Marine Dr., particularly bad ground was encountered west of Cedarhurst. Removal of the poor material (including tree stumps) increased the cost of the project substantially.

 
 
           

C07A1A0015

Cambie: Marine to 49th

477,000

630,149

(153,149)

-32.11%

After reconstruction of this section of Cambie Street had commenced, the scope of the project was increased to include Cambie between 49th and 47th Avenue. The change was made after this additional section was found to be in as bad condition as the section between 49th Avenue and Marine Drive.

 
 
         

1997-1999
Pedestrians & Bikes

           

C07A2G

Pedestrian & Other Struct

439,750

168,826

270,924

61.61%

In 1997 and 1998, Council approved $500,000 for development of a pedestrian connection between Granville Bridge and Pacific Boulevard. Currently, consulting and design work is being carried out at an estimated cost of $100,000. The funds being closed in this category are part of the remaining $400,000. Public consultation so far has resulted in a major change in scope for the project. Once the preliminary design and consulting has been completed, a report will be presented to Council on a modified version of this project, and funds as necessary will be sought at that time.

 
 
 
 
 
         

1997-1999
Transit & Safety

           

C07A4A0027

Pender St: Hamilton-Carra

560,000

680,447

(120,447)

-21.51%

This project involved pavement reconstruction on Pender St. between Hamilton and Carrall Streets. More sidewalk was replaced than originally anticipated because of the greenway designation of Pender St. Also trolley poles that required relocating were more expensive to move than normal due to their proximity to the deteriorating areaway at the Sun building. In addition, the scope of the project was extended 1 block west to match with recently completed DFPS work.

 
 
 
 
           

C07A4B

Aging Uncurbed Arterials

340,681

121,284

219,397

64.40%

Over the last few years there have not been as many projects in this category as anticipated, and the remaining funding is being used to help balance the accounts being closed by this report.