CAPITAL ACCOUNT CLOSURES
STREETS
To close and balance the accounts for the 1997 to 1999 Streets Capital Closeout, the following summary has been prepared. The accounts being closed represent projects which commenced prior to the year 2000, and for which, as a group, funding and expenditures occurred over a number of years. Accordingly, no direct comparison exists between the closeouts and the 1997 to 1999 Streets Basic Capital Budgets.
This Streets Capital Closeout summary completes the accounting for streets construction work involving expenditures of $68,554,525 This money funded various projects including traffic calming, street reconstruction, Local Improvement street paving and curbing, lane paving, sidewalk construction, a variety of left-turn bays, property acquisition and minor street alterations. The City funding for this work was $68,537,754 resulting in an over-expenditure of $16,771 (approximately 0.02%).
Explanations are included for account groups which have variances of more than the established limit of 15% and $50,000. As well, explanations have been included for individual projects that have variances in excess of this limit.
PROVISION OF FUNDS
After completing the projects covered by this closeout, funding of $16,771 is required. It is proposed that this be provided from existing approved funds in the 2000-2002 Streets Capital Account Group set aside for Grading & Opening Streets and Lanes (SCA5G-UNAP).
1997-1999 Capital Plan Close-out
STREETS
Capital Budget Program
YTD Actual
as of
Unexpended
Variance
Total Budget
March 31, 2003
Balance
Percentage
Infrastructure
$
$
$
Repair Arterial Streets
6,987,000
6,447,619
539,381
7.72%
Repair Local Streets
766,000
678,483
87,517
11.43%
Major Maintenance - Struc
10,834,000
10,475,090
358,910
3.31%
Pavement & Materials Rese
200,000
200,308
(308)
(0.15%)
**** Streets - Infrastructure
18,787,000
17,801,500
985,500
5.25%
Pedestrian & Bikes
New Sidewalks
986,925
894,092
92,833
9.41%
Sidewalk Reconstruction -
1,331,547
1,619,771
(288,224)
(21.65%)
Sidewalk Reconst - Part B
1,639,225
1,599,191
40,034
2.44%
Curb Ramp Program
1,000,000
1,000,001
(1)
(0.00%)
Bicycle Network
3,639,960
3,692,833
(52,873)
(1.45%)
Beautification & Street T
204,813
226,989
(22,176)
(10.83%)
Pedestrian & Other Struct
439,750
168,826
270,924
61.61%
Greenways
956,076
1,082,763
(126,687)
(13.25%)
Miscellaneous Projects
57,000
53,210
3,790
6.65%
**** Pedestrians & Bikes
10,255,296
10,337,676
(82,380)
(0.80%)
Transit & Safety
Arterial Improvements
12,178,374
11,097,189
1,081,185
8.88%
Aging Uncurbed Arterials
340,681
121,284
219,397
64.40%
Bus Slabs & landings
695,000
650,232
44,768
6.44%
Property Fund - Transit/S
642,300
668,689
(26,389)
(4.11%)
**** Transit & Safety
13,856,355
12,537,394
1,318,961
9.52%
Local Area Traffic
Neighbourhood Traffic Co
1,438,250
1,593,877
(155,627)
(10.82%)
Higher Zoned Streets
1,423,747
1,842,871
(419,124)
(29.44%)
Residential Streets
5,098,491
5,525,844
(427,353)
(8.38%)
Higher Zoned Lanes - Loc
225,271
184,482
40,789
18.11%
Residential Lanes - Loc
1,987,428
2,066,329
(78,901)
(3.97%)
Drainage & Utility Reloc
675,782
691,361
(15,579)
(2.31%)
Grade/Open Streets & Lan
86,200
55,479
30,721
35.64%
Minor Property Acquisiti
8,794
8,794
0
0.01%
Traffic Circles / Speed
6,980
19,574
(12,594)
(180.42%)
Miscellaneous Projects
675,200
712,858
(37,658)
(5.58%)
*****Local Area Traffic & Other
11,626,143
12,701,467
(1,075,324)
(9.25%)
Capital Budget Program
YTD Actual
as of
Unexpended
Variance
Total Budget
March 31, 2003
Balance
Percentage
Major Projects
Downtown Heritage Railway
10,125,500
10,881,561
(756,061)
(7.47%)
Other Projects
1,161,000
1,155,502
5,498
0.47%
*** Major Projects
11,286,500
12,037,062
(750,562)
(6.65%)
Other Charges
(217,061)
(4,500)
(212,561)
97.93%
Other Charges 1994-96
(396,609)
-
(396,609)
100.00%
Other Charges 1997-99
3,340,130
3,143,925
196,205
5.87%
*** Other Charges
2,726,460
3,139,425
(412,966)
(15.15%)
TOTAL STREETS CAPITAL
68,537,754
68,554,525
(16,771)
(0.02%)
Proposed allocation of funding to be carried forward to the 2000-2002 Plan
Funding from the 2000-2002 Unappropriated Account - Grade/Open Street Lanes (SCA5G-UNAP).
Total
(16,771)
Explanations are provided where variances are greater than $50,000 and 15% of the budget as follows:
Order Group
Total Budget
YTD Actual as of March 31, 2003
Unexpended Balance
Variance Percentage
1997-1999
Infrastructure
C07A1A0004
Knight St: Various Locati
1,090,000
1,263,696
(173,696)
-15.94%
Unanticipated costs occurred on this pavement reconstruction project due to a cave-in at 63rd Avenue. This subsidence required extra protection for safety reasons, followed by extensive backfilling. Also more expensive experimental sbs and eva polymer asphalts were used on this project to test their effectiveness.
C07A1A0011
SW Marine: Cedarhurst-Car
100,000
206,816
(106,816)
-106.82%
During the reconstruction of this section of Marine Dr., particularly bad ground was encountered west of Cedarhurst. Removal of the poor material (including tree stumps) increased the cost of the project substantially.
C07A1A0015
Cambie: Marine to 49th
477,000
630,149
(153,149)
-32.11%
After reconstruction of this section of Cambie Street had commenced, the scope of the project was increased to include Cambie between 49th and 47th Avenue. The change was made after this additional section was found to be in as bad condition as the section between 49th Avenue and Marine Drive.
1997-1999
Pedestrians & Bikes
C07A2G
Pedestrian & Other Struct
439,750
168,826
270,924
61.61%
In 1997 and 1998, Council approved $500,000 for development of a pedestrian connection between Granville Bridge and Pacific Boulevard. Currently, consulting and design work is being carried out at an estimated cost of $100,000. The funds being closed in this category are part of the remaining $400,000. Public consultation so far has resulted in a major change in scope for the project. Once the preliminary design and consulting has been completed, a report will be presented to Council on a modified version of this project, and funds as necessary will be sought at that time.
1997-1999
Transit & Safety
C07A4A0027
Pender St: Hamilton-Carra
560,000
680,447
(120,447)
-21.51%
This project involved pavement reconstruction on Pender St. between Hamilton and Carrall Streets. More sidewalk was replaced than originally anticipated because of the greenway designation of Pender St. Also trolley poles that required relocating were more expensive to move than normal due to their proximity to the deteriorating areaway at the Sun building. In addition, the scope of the project was extended 1 block west to match with recently completed DFPS work.
C07A4B
Aging Uncurbed Arterials
340,681
121,284
219,397
64.40%
Over the last few years there have not been as many projects in this category as anticipated, and the remaining funding is being used to help balance the accounts being closed by this report.