ADMINISTRATIVE REPORT
Date: October 22, 2002
Author/Local: P. Kemp/7257RTS No. 03029
CC File No. 1805
Council: November 5, 2002
TO:
Vancouver City Council
FROM:
General Manager of Engineering Services and Manager, Materials Management
SUBJECT:
Award of Tender PS02024 - Processing of Landfill Cover Material and Ancillary Services
RECOMMENDATION
That Council accept the low bid offering best value to the City from Poschner Construction (88) Ltd. for the Processing of Landfill Cover Material and Ancillary Services for a two (2) year period from date of purchase order, with the option for three (3) additional one (1) year terms, at an estimated cost of $1,771,998. plus the 7% GST (less any municipal rebate received) and PST (where applicable), subject to a contract satisfactory to the Director of Legal Services, with the source of funds to be from the Vancouver Landfill operating budget with offset.
POLICY
The policy of Council is to award contracts for the purchase of equipment, supplies, and services that will give the highest value based on quality, service and price.
Contracts with a value over $300,000 are referred to Council.
BACKGROUND
The City owns and operates a 635 hectare municipal solid waste landfill in Delta. A critical component of the operation is the need for a continuous supply of Cover Material to cover the refuse on a daily basis. Cover material is primarily waste excavation material from sewer, water and street construction that is delivered to the Landfill. The Contractor stockpiles the excavation material and separates oversized rubble from the soil. The contractor then transports both soil and the rubble to various sites within the Landfill. The contract for cover material also provides for fire protection services, contingency pumping and ancillary services, such as the rental of the contractor's on site equipment, with and without operator, to supplement City forces at the Landfill during peak periods or special projects.
DISCUSSION
Tenders for the above were opened on August 21, 2002 and referred to the General Manager of Engineering Services and the Manager of Materials Management for report. The PST (where applicable), and the 7% GST (less any municipal rebate received) are in addition to the pricing shown in this report.
This tender called for pricing for stockpiling of Excavation Material and Other Cover Material within the Stockpiling Area, removal of Rubble from the Excavation Material within the Stockpiling area, and transportation of Processed Material, Rubble and Other Cover Material from the Stockpiling Area to other areas in the Landfill. This tender was advertised in a local newspaper as well as on the internet.
Three bids were received with estimated prices ranging from$1,771,998 to $2,187,500 for the initial two (2) year period.
Bid No. 1
Bid No. 2
Bid No. 3
Est. Annual Qty.
Poschner Construction
Delta Aggregates
JJM
Processed Excavation
90,000 (cubic metres/year)
$420,300
$427,500
$405,000
Other Cover
5,000
(cubic metres/year)23,350
23,750
22,500
Rubble
9,000
(cubic metres/year)41,850
42,750
40,500
Fire Protection
24 hr/365 day
38,000
33,000
132,000
Contingency Pumping
24 hr/365 day
6,000
25,000
12,000
Ancillary Services
356,499
451,375
481,750
Annual
$885,999
$1,003,375
$1,093,750
Total 2 Year
$1,771,998
$2,006,750
$2,187,500
Ancillary Services includes 2500 hours of excavator time, pads, brush grapples, haul truck, water trucks, construction, fabrication and labouring.
The contract is for a two (2) year period, with up to three (3) additional one (1) year periods by mutual agreement between the City of Vancouver and the Contractor. Prices shall remain firm for the duration of the first twelve (12) month period. For each subsequent 12 month period, all prices will be adjusted by the change in the Consumer's Price Index for all items published by Statistics Canada for the Vancouver area.
Bid No. 1 from Poschner Construction (88) Ltd. meets the City's requirements,
is acceptable and recommended.FINANCIAL IMPLICATIONS
The prices provided in the Poschner Construction's tender are for all intents and purpose identical to prices currently being paid for these services. Therefore, entering into a Contract with Poschner Construction will not impact the Landfill operating budget and consequently will not impact the solid Waste Utility budget. The operations provided for in this tender are a necessity for the operation of the Landfill and are currently performed by an on site contractor. Funding for these services are provided for in the Vancouver Landfill operating budget.
CONCLUSION
Accordingly, we recommend acceptance of the low bid meeting the City's requirements and offering best value from Poschner Construction (88) Ltd. for the Processing of Landfill Cover Material and Ancillary Services for a two (2) year period, at an estimated cost of $1,771,998.
* * * * *
![]() |
![]() |
![]() |
![]() |
![]() |
(c) 1998 City of Vancouver